Laserfiche WebLink
e <br /> EXHIBIT 2 - FEE SCHEDULE <br /> (May 2011 — Amendment No . 1 ) <br /> Method and Amount of Compensation <br /> SChulke. Rittle & Stoddard , L . L . C . . proposes to provide the above Scope of Services based on the following lump sum fees : <br /> Amendment Amendment <br /> Original Pee No . I Total <br /> I . Surveying : Location of fire hydrants, valves, manholes, driveways, $ 2 , 500 . 00 N /A $2 ,500.00 <br /> culverts, and existing utility mains. not Surveyed by IRCDUS , within <br /> 53 " St . right-ol= way. between Lateral 1-1 and the PITC RR : and survey <br /> the location ol' exisling utilities excavated by SITEVIERKS, INC . <br /> 2 . Fxcavation for field verification ofactual locations ofexisting $ 12. 970 . 00 N/A $ 12 ,970 .00 <br /> underground utilities and structures . It is anticipated that SBS will <br /> subcontract this work to SH WERKS INC . <br /> 3 . 5ngineering design , preparation of Construction Plans & $ 25 , 000 . 00 N/A $25, 000.00 <br /> Specifications, preparation and submittal of permit <br /> Applications . preparation of bid documents . Assistance during <br /> Bidding, bid evaluation . contract award . <br /> 41 . Construction Administration ( Pre-con , shop review, pay requests, $ 16, 000 . 00 $89000.00 $24,000,00 <br /> change orders, minor plan modifications, Periodic Construction/Field <br /> Inspections, As- Built review, final documentation for close-out and <br /> final certifications . ) <br /> 5 . Reimhursables : Reitnbursemcnt for payment of direct costs, including $3 , 000 . 00 estimate N/A $3 ,000. 00 <br /> Reproduction and application fees . ( See below for actual costs) <br /> Total : $ 59,470 . 00 $8,000. 00 $67,470. 00 <br /> Printing and Reproduction <br /> The County shall make direct payment to our office for the cost of printing project plan sheets required for utility coordination and <br /> for <br /> copies of reports, drawings, Spec ilication s, and other pertinent items required by federal , state and local agencies from whom approval <br /> of <br /> the project must be obtained , material suppliers, and other interested parties, but may charge only for the actual cost of providing <br />such <br /> copies based on the following tabulation : <br /> 8 1 /2 " x I I " $ 0 . 12/sheet Blue Line prints $ 0 . 333 /SF <br /> I I " x 17 " $ 0 . 50/sheet Reproducible Sepias $ 0 . 75 /SF <br /> 31 /2 " diskette $ 2 . 00/cacti Reproducible Mylars $ L00/SF <br /> CD $ 4. 00/each <br /> Application Fees <br /> The county shall make direct payment Io our office for the actual cost of all construction permit application fees paid to jurisdictional <br /> agencies, including but not limited to : <br /> I . D . I ? . P . . I . R . C . Fnginecring ( Right-of Way ), I . R. F . W . C . D . , S . .I . R . W . M . D . , I . D . O . T. <br /> Remainder of Page Intentionally Left Blank <br />