Laserfiche WebLink
SECTION 0 10 10 <br /> SUMMARY OF WORK <br /> PART 1 — GENERAL <br /> 1 . 01 LOCATION OF WORK <br /> A . The work is located at the Spoonbill Marsh Wetland Facility , east of U . S . Highway 1 , off 57 `x' <br /> Street. This location is north of the North Relief Canal , west of the Grand Harbor parcel and <br /> abutting the Indian River Lagoon on the east . To schedule a site visit, contact Art Pfeffer, 772 - <br /> 226- 1826 or 772- 571 - 7511 . <br /> 1 . 02 SCOPE OF WORK <br /> A . The Contractor will furnish and install the Floating Mat System (FMS ) a .k. a floating plant <br /> mats and all plant material as required by Indian River County and as depicted in the <br /> Contract Specifications, Engineering Plans and Details . The Contractor will provide an <br /> Implementation Plan that maximizes the treatment efficiency of the floating plant mat, and <br /> provide sufficient quantity at strategic locations , in order to achieve a demonstrable net <br /> environmental benefit as defined in Permit FL166511 -002 -IW5A . At a minimum the <br /> floating mats will be located at the main points of ingress and egress to each of the major <br /> runnels . <br /> B . This project will be the installation of 20 , 000 square feet of effective surface area of floating <br /> plant mats . FMS is to be deployed at up to 40 specified locations with the initial planting <br /> sufficient to provide 80 % aerial coverage within 6 months . The plants to be installed within <br /> the mats shall be halophyte, native to Indian River County, Florida . See the Plans and Details <br /> for acceptable species . The planting density shall be consistent with the buoyant marine <br /> foam being used . The installation includes delivery to the project site of all fabricated mats , <br /> plant material and associated hardware. The defined estimated quantity is a maximum and is <br /> subject to be increased or decreased based on the unit price bid . <br /> C . A FMS shall consist of buoyant marine foam of a heavy duty commercial grade material that <br /> will provide sufficient floatation to support planted aquatic vegetation and wildlife without <br /> capsizing or sinking . The buoyant marine foam shall have a high surface area to volume ratio <br /> in order to enhance periphyton and biofilm growth that will facilitate nutrient removal and <br /> improve water quality in a constructed wetland . The FMS must demonstrate the proven <br /> ability to withstand marine conditions including anticipated wave action generated by high <br /> winds over the longest fetch in the system . Contractor shall provide nitrogen and <br /> phosphorus efficiency removal data for the system to be provided . <br /> D . Special Requirement : CONTRACTOR shall provide full cost accounting estimates of the <br /> Operation and Maintenance cost for a five year cycle . Contractor will provide follow up site <br /> visits by trained personnel to assess growth rates and condition of mats for a minimum of <br /> one visit per month , for twelve. months (one year) following the installation and planting of <br /> the floating plant mats . A Progress Report ( electronic format) shall be submitted monthly <br /> documenting rates of plant growth , rates of survival and overall condition of the plant mats . <br /> 01010 - 1 <br />