My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The surface of each mat shall have a minimum of 80 % coverage of plants within ( 6) six <br /> months ( 180 days ) of completion of installation and planting . The Contractor will replace <br /> dead plants within ( 14) fourteen days of being notified by the Owner . <br /> 1 . 03 WORK BY OTHERS <br /> A . None . <br /> 1 . 04 WORK SEQUENCE <br /> A . Perform Work to ensure completion of the Work within the Contract Time . Completion <br /> dates of the various stages shall be in accordance with the approved construction <br /> schedule submitted by the CONTRACTOR . The CONTRACTOR shall provide a written <br /> plan and schedule in the event: he desires to perform work from different stages <br /> concurrently . A written plan describing the CONTRACTOR ' s intent must be submitted <br /> for approval by the OWNER . <br /> 1 . 05 CONTRACTOR ' s USE OF PREMISES <br /> A . CONTRACTOR shall have use of the premises as indicated on the drawings for the <br /> performance of the Work , subject to ongoing work by other contractor ' s and the County . <br /> B . Coordinate use of premises with OWNER and ENGINEER . <br /> C . CONTRACTOR shall assume full responsibility for security of all his and his <br /> subCONTRACTOR ' s materials and equipment stored on the site . <br /> D . If directed by the OWNER or ENGINEER, move any stored items which interfere with <br /> operations of OWNER or other contractor ' s . <br /> E . Obtain and pay for use of additional storage or work areas if needed to perform the Work . <br /> F . The CONTRACTOR shall be responsible for obtaining temporary sanitary facilities <br /> during construction and all associated costs . <br /> 1 . 06 SITE ACCESS AND EXISTING FACILITIES <br /> A . Access to the site and equipment delivery is limited to daylight hours of 7 : 00 a . m . to 5 : 00 <br /> p . m . , Monday through Friday . Weekend access must be approved by OWNER. All work <br /> which interrupts normal system operation shall be scheduled with the OWNER prior to <br /> its construction . Scheduling shall include summary of procedures to be taken , date/time <br /> of work, and duration of activities . Due to operation issues , the OWNER reserves the <br /> right to modify the schedule and restrict time of day and/or date( s) of work ( for both <br /> work herein listed and other work not listed but affecting operations) that impacts the <br /> system operations . <br /> B . The CONTRACTOR shall provide and maintain the current level or a greater level of <br /> perimeter site security and restricted public access at all times throughout construction of <br /> the project. <br /> 01010 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.