Laserfiche WebLink
SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted in <br /> accordance with the Contract Documents . No separate payment will be made for <br /> incidental items of work not shown in the Agreement . <br /> 1 . 02 EQUIPMENT AND MATERIALS IN STORAGE <br /> Partial payment for materials in proper storage at the site of the work or other <br /> approved storage site will be made for those items for which the Contractor has <br /> submitted paid invoices to the Owner. The partial payment for stored materials will <br /> be 50% of the value of' materials , based on receipted bills , fiimished but not <br /> incorporated in the work, as determined by Owner. <br /> 1 . 03 MEASUREMENT <br /> A . Mobilization : Measurement shall be on a lump sum basis , and shall be limited to the <br /> following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ( $) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 1003000 31000 <br /> 1001000 5003000 151000 <br /> 500 , 000 1005000 301000 <br /> Should the lump sum price bid for the item Mobilization exceed the maxirnum <br /> permissible amount for this item , as specified herein , the bid price will be reduced to <br /> the maximum permissible amount, and the reduced price will be used in correctly <br /> determining the total price; for comparison of bids received . <br /> B . Payment will be based on a square foot measurement of installed floating mat with <br /> plant material properly anchored and tethered . <br /> PAYMENT <br /> Payment will be made at the respective contract unit and/or lump sum price for each item <br /> shown in the Agreement, installed and accepted , which price and payment shall constitute <br /> full compensation for fumishing all materials and performing all work in connection <br /> therewith and incidental thereto . <br /> 1 . 05 RESTORATION OF DAMAGED SURFACES , STRUCTURES AND PROPERTY <br /> Where pavement, trees , shrubbery , fences , or other property or surface structures not <br /> designated as pay items have been damaged , removed, or disturbed by the Contractor, <br /> m m J� _ i <br />