My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 <br /> PROJECT MEETINGS <br /> PART 1 — GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . The Contractor shall cooperage and coordinate with the Owner to schedule and administer <br /> pre- construction meeting, periodic progress meetings and specially called meetings <br /> throughout progress of the work . <br /> 1 . Prepare agenda for meetings . <br /> 2 . Make physical arrangements for meetings . <br /> 3 . Preside at meetings . <br /> 4 . Record the minutes ; include significant proceedings and decisions . <br /> 5 . Reproduce and distribute copies of minutes within 15 working days after each <br /> meeting . <br /> a . To participants in the meeting . <br /> b . To Owner and other parties affected by decisions made at the meeting . <br /> B . Representatives of Contractors , Owner, Subcontractors and suppliers attending meetings <br /> shall be qualified and authorized to act on behalf of the entity each represents . <br /> C . Attend meetings to ascertain that work is expedited consistent with Contract Documents <br /> and construction schedules . <br /> 1 . 02 RELATED REQUIREMENTS <br /> A . Instructions to Bidders are included in Division 0 . <br /> B . Construction Schedules are included in Section 01311 . <br /> C . Shop Drawings, Working Drawings and Samples are included in Section 01340 . <br /> D . Contract Closeout is included in Section 01700 . <br /> E . Operating and Maintenance Data is included in Section 01730 . <br /> 1 . 03 PRE- CONSTRUCTION MEETING <br /> A . Schedule a preconstruction meeting no later than 10 days after date of Notice to Proceed . <br /> B . Location : A central site, convenient for all parties , designated by the Owner . <br /> C . Attendance <br /> I . Owner' s Representative . <br /> 2 . Resident Project Representative. <br /> 4 . Contractor' s Superintendent . <br /> 5 . Major suppliers . <br /> 01200- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.