F . No portion of the work requiring a shop drawing, sample , or product data shall be started <br /> nor shall any materials be fabricated or installed prior to the approval or qualified <br /> approval of such item . Fabrication performed , materials purchased or on - site construction <br /> accomplished which does not conform to approved shop drawings and data shall be at the <br /> Contractor' s risk. The Owner will not be liable for any expense or delay due to <br /> corrections or remedies required to accomplish conformity . <br /> G . Project work, materials , fabrication , and installation shall conform with approved shop <br /> drawings , applicable samples , and product data . <br /> 1 . 04 SUBMISSION REQUIREMENTS <br /> A . Make submittals promptly in accordance with approved schedule and in such sequence as <br /> to cause no delay in the Work or in the work of any other contractor . <br /> B . Each submittal , appropriately coded , will be returned within 30 calendar days following <br /> receipt of submittal by the Engineer. <br /> C . Number of submittals required : <br /> I . Shop Drawings : Submit the number of opaque reproductions which the <br /> contractor requires , plus five ( 5 ) copies which will be retained by the Owner . <br /> D . Submittals shall contain : <br /> 1 . The date of submission and the dates of any previous submissions . <br /> 2 . The Project title and number. <br /> 3 . Contractor identification . <br /> 4 . The names of: <br /> a . Contractor <br /> b . Supplier <br /> C . Manufacturer <br /> 5 . Identification of the product, with the section number, page and paragraph ( s) . <br /> 6 . Field dimensions , clearly identified as such . <br /> 7 . Relation to adjacent or critical features of the work or materials . <br /> 8 . Applicable standards, such as ASTM or Federal Standards numbers . <br /> 9 . Identification of deviations from Contract Documents . <br /> 10 . Identification of revisions on resubmittals . <br /> IL A blank space suitably sized for Contractor stamps . <br /> 12 . Contractor ' s stamp or review and approval , initialed or signed , certifying to review <br /> of initialed or signed , certifying to review of submittal , verification of products, field <br /> measurements and Geld construction criteria , and coordination of the information <br /> within the submittal with requirements of the work and of Contract Documents . <br /> 13 . Where calculations are required to be submitted by the Contractor, the <br /> calculations shall have been checked by a qualified individual other than the <br /> preparer. The submitted calculations shall clearly show the names of the preparer <br /> and of the checker . <br /> 01340- 3 <br />