Laserfiche WebLink
work depends upon field measurements , such measurements shall be made and <br /> noted on the drawings before being submitted . <br /> 5 . Submittals for equipment specified under Divisions 1 1 shall include a listing of <br /> all installations where identical or similar equipment has been installed and been <br /> in operation for a period of at least one year. <br /> B . Product Data <br /> I . Product data as specified in individual Sections include, standard prepared data <br /> for manufactured products (sometimes referred to as catalog data) , such as the <br /> manufacturer' s product specification and installation instructions, availability of <br /> colors and patterns , manufacturer' s printed statements of compliances and <br /> applicability, roughing- in diagrams and templates, catalog cuts , product <br /> photographs , maintenance instructions and printed product warranties , as <br /> applicable to the work: . <br /> 1 . 03 CONTRACTOR' S RESPONSIBILITIES <br /> A . Review shop drawings, product data and samples , including those by subcontractors , <br /> prior to submission to determine and verify the following : <br /> 1 . Field measurements <br /> 2 . Field construction criteria <br /> 3 . Catalog numbers and similar data <br /> 4 . Conformance with related Sections <br /> B . Each shop drawing , sample and product data submitted by the Contractor shall have <br /> affixed to it the following Certification Statement including the Contractor' s Company <br /> name and signed by the Contractor : " Certification Statement : by this submittal , T hereby <br /> represent that I have determined and verified all field measurements , field construction <br /> criteria, materials, dimensions , catalog numbers and similar data and I have checked and <br /> coordinated each item with other applicable approved shop drawings and all Contract <br /> requirements . " Shop drawings and product data sheets l 1 -inch by 17 -inch and smaller <br /> shall be bound together in an orderly fashion and bear the above Certification Statement <br /> on the cover sheet . The cover sheet shall fully describe the packaged data and include a <br /> listing of all items within the package . Provide to the Resident Project Representative a <br /> copy of each transmittal sheet for shop drawings , product data and samples at the time of <br /> submittal to the Engineer . <br /> C . The Contractor shall utilize the following Shop Drawing numbering system : <br /> 1 . The Submittal Log Number shall reference the Specification Section Number . <br /> 2 . The numbering system shall be specification section number followed by a " 1 " <br /> for original submittal , " 1 A " for first resubmittal and so forth , (for example : <br /> 15050 - 1 , 15050 - 1 Al 15050 - IB . . . ) <br /> D . Notify the Engineer in writing, at the time of submittal , of any deviations in the <br /> submittals from the requirements of the Contract Documents . <br /> E . The review and approval of shop drawings , samples or product data by the Engineer shall <br /> not relieve the Contractor fronn the responsibility for the fulfillment of the terms of the <br /> Contract . All risks of error and omission are assumed by the Contractor and the Engineer <br /> will have no responsibility therefor . <br /> 01340-2 <br />