Laserfiche WebLink
SECTION 01340 <br /> SUBMITTALS <br /> PART 1 - GENERAL <br /> 1 . 01 DESCRIPTION OF REQUIREMENTS <br /> A . This Section specifies the general methods and requirements of submissions applicable to <br /> Shop Drawings, Product Data, Samples , Construction Photographs, and Construction or <br /> Submittal' Schedules . Additional general submission requirements are contained in <br /> Article 6 . 17 of the General Conditions . Detailed submittal requirements are specified in <br /> the technical Sections . <br /> B . All submittals shall be clearly identified by reference to Section Number, Paragraph , <br /> Drawing Number or Detail as applicable . Submittals shall be clear and legible and of <br /> sufficient size for presentation of data . <br /> C . The Contractor is to maintain an accurate updated submittal log and will bring this log to <br /> each scheduled progress meeting with the Owner . This log should include the following <br /> items : <br /> 1 . Submittal -Description and File number assigned . <br /> 2 . Date returned to Contractor . <br /> 3 . Status of submittal (REVIEWED , NO COMMENTS ; REVIEWED <br /> COMMENTS AS NOTED ; REJECTED , REVISE AND RESUBMIT ; or NOT <br /> REVIEWED) . <br /> 4 . Date of resubmittal and return ( as applicable) . <br /> 5 . Date material released for fabrication . <br /> 6 . Projected date of fabrication . <br /> 7 . Projected date of delivery to site. <br /> 8 . Status of O &M submittal . <br /> 1 . 02 SHOP DRAWINGS , PRODUCT DATA , SAMPLES <br /> A . Shop Drawings <br /> 1 . Shop drawings as specified in individual Sections include , custom - prepared data <br /> such as fabrication and installation (working) drawings, scheduled infonnation , <br /> setting diagrams, actual shop work manufacturing instructions, custom templates, <br /> coordination drawings and test reports including perfonnance curves and <br /> certifications , as applicable to the work . <br /> 2 . All shop drawings submitted by subcontractors shall be sent directly to the <br /> Contractor for checking . The Contractor shall be responsible for their submission <br /> at the proper time so as to prevent delays in delivery of materials . <br /> 3 . Check all subcontractors ' shop drawings regarding measurements , size of <br /> members , materials and details to make sure that they conform to the intent of the <br /> Drawings and related Sections . Return shop drawings found to be inaccurate or <br /> otherwise in error to the subcontractors for correction before submission thereof. <br /> 4 . All details on shop drawings shall show clearly the relation of the various parts to <br /> the main members and lines of the structure and where correct fabrication of the <br /> 01340 - 1 <br />