Laserfiche WebLink
SECTION 01600 <br /> DELIVERY, STORAGE AND HANDLING <br /> PART 1 — GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . This Section specifies the general requirements for the delivery handling, storage and <br /> protection for all items required in the construction of the work. Specific requirements , if <br /> any , are specified with the related item . <br /> 1 . 02 TRANSPORTATION AND DELIVERY <br /> A . Transport and handle items in accordance with manufacturer' s instructions . <br /> B . Schedule delivery to reduce long term on - site storage prior to installation and/or <br /> operation . Under no circumstances shall equipment be delivered to the site more than one <br /> month prior to installation without written authorization from the Owner. <br /> C . Coordinate delivery with installation to ensure minimum holding time for items that are <br /> hazardous , flammable , easily damaged or sensitive to deterioration . <br /> D . Deliver products to the site in manufacturer' s original sealed containers or other packing <br /> systems, complete with instructions for handling, storing, unpacking, protecting and <br /> installing . <br /> E . All items delivered to the site shall be unloaded and placed in a manner which will not <br /> hamper the Contractor' s normal construction operation or those of Subcontractors and <br /> other Contractors and will not interfere with the flow of necessary traffic . <br /> F . Provide necessary equipment and personnel to unload all items delivered to the site . <br /> G . Promptly inspect shipment to assure that products comply with requirements, quantities <br /> are correct and items are undamaged . NotifyOwner verbally , and in writing , of any <br /> problems . <br /> 1 . 03 STORAGE AND PROTECTION <br /> A . Store and protect products in accordance with the manufacturer' s instructions, with seals <br /> and labels intact and legible. Storage instruction shall be studied by the Contractor and <br /> reviewed with the Owner . Instruction shall be carefully followed and a written record of <br /> this kept by the Contractor . Arrange storage to permit access for inspection . <br /> B . Store loose granular materials on solid flat surfaces in a well - drained area . Prevent <br /> mixing with foreign matter. <br /> END OF SECTION <br /> 01600- 1 <br />