Laserfiche WebLink
SECTION 01610 <br /> MATERIAL AND EQUIPMENT <br /> PART 1 — GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . Material and equipment incorporated into the work : <br /> 1 . Conform to applicable specifications and standards . <br /> 2 . Comply with size, type quantity and quality specified , or as specifically approved <br /> in writing by the Owner . <br /> 1 . 02 RELATED WORK <br /> A . Conditions of the Contract <br /> B . Summary of Work is included in Section 0 10 10 . <br /> C . Special Provisions is included in Section 01170 . <br /> D . Submittals are included in Section 01340 . <br /> E . Substitutions and Product Options are included in Section 01630 . <br /> F . Cleaning is included in Section 01710 . <br /> G . Operating and Maintenance Data is included in Section 01730 . <br /> H . Warranties and Bonds are included in Section 01740 . <br /> 1 . 03 APPROVAL OF MATERIALS <br /> 1 . 04 MANUFACTURER' S INSTRUCTIONS FOR INSTALLATION (NOT USED ) <br /> 1 . 05 TRANSPORTATION AND HANDLING <br /> A . Arrange deliveries of products in accord with construction schedules , coordinate to avoid <br /> conflict with work and conditions at the site . <br /> B . Provide equipment and personnel to handle products by methods to prevent soiling or <br /> damage to the site . <br /> 1 . 06 STORAGE AND PROTECTION <br /> A . Equipment shall not be shipped until approved by the Owner . The intent of this <br /> requirement is to reduce on - site storage time prior to installation . Under no circumstances <br /> shall equipment or plants be delivered to the site more than one month prior to <br /> installation without written authorization from the Owner . <br /> 01610 - 1 <br />