My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01610 <br /> MATERIAL AND EQUIPMENT <br /> PART 1 — GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . Material and equipment incorporated into the work : <br /> 1 . Conform to applicable specifications and standards . <br /> 2 . Comply with size, type quantity and quality specified , or as specifically approved <br /> in writing by the Owner . <br /> 1 . 02 RELATED WORK <br /> A . Conditions of the Contract <br /> B . Summary of Work is included in Section 0 10 10 . <br /> C . Special Provisions is included in Section 01170 . <br /> D . Submittals are included in Section 01340 . <br /> E . Substitutions and Product Options are included in Section 01630 . <br /> F . Cleaning is included in Section 01710 . <br /> G . Operating and Maintenance Data is included in Section 01730 . <br /> H . Warranties and Bonds are included in Section 01740 . <br /> 1 . 03 APPROVAL OF MATERIALS <br /> 1 . 04 MANUFACTURER' S INSTRUCTIONS FOR INSTALLATION (NOT USED ) <br /> 1 . 05 TRANSPORTATION AND HANDLING <br /> A . Arrange deliveries of products in accord with construction schedules , coordinate to avoid <br /> conflict with work and conditions at the site . <br /> B . Provide equipment and personnel to handle products by methods to prevent soiling or <br /> damage to the site . <br /> 1 . 06 STORAGE AND PROTECTION <br /> A . Equipment shall not be shipped until approved by the Owner . The intent of this <br /> requirement is to reduce on - site storage time prior to installation . Under no circumstances <br /> shall equipment or plants be delivered to the site more than one month prior to <br /> installation without written authorization from the Owner . <br /> 01610 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.