Laserfiche WebLink
1 . 05 SUBSTITUTIONS <br /> A . In order for substitutions to be considered, the Contractor shall submit, within 30 days of <br /> issuance of Notice of Award, complete data as set forth herein to permit complete <br /> analysis of all proposed substitutions noted on his substitutions list . No substitution shall <br /> be considered unless the Contractor provides the required data in accordance with the <br /> requirements of this Section within the 30 day period . <br /> B . Submit separate request for each substitution . Support each request with : <br /> 1 • Complete data substantiating compliance of proposed substitution with <br /> requirements stated in Contract Documents : <br /> a . Product identification , including manufacturer' s name and address . <br /> b • Manufacturer' s literature; identify : <br /> 1 ) Product description . <br /> 2 ) Reference standards . <br /> 3 ) Performance and test data . <br /> 4) Operation and maintenance data . <br /> C . Samples, as applicable . <br /> d . Name and address of similar projects on which product has been used, <br /> and date of each installation . <br /> 2 . Itemized comparison of the proposed substitution with product specified ; List <br /> significant variations . Substitution shall not change design intent and shall <br /> perform equal to that specified. <br /> 3 . Data relating to impact on construction schedule occasioned by the proposed <br /> substitution . <br /> 4 . Any effect of substitution on separate contracts . <br /> 5 . List of changes required in other work or products . <br /> 6 . Accurate cost data comparing proposed substitution with product specified . <br /> a. Amount of any net change to Contract Sum . <br /> 7 . Designation of required license fees or royalties . <br /> 8 . Designation of availability of maintenance services, sources of replacement <br /> materials . <br /> C . Substitutions will not be considered for acceptance when : <br /> 1 . They are indicated or implied on shop drawings or product data submittals <br /> without a formal request from Contractor. <br /> 2 . They are requested directly by a Subcontractor or supplier. <br /> 3 . Acceptance will require substantial revision of Contract Documents . <br /> D . Requests for substitutions submitted after Notice of Award will not be considered unless <br /> evidence is submitted to the Owner that all of the following circumstances exist: <br /> 1 . The specified product is unavailable for reasons beyond the control of the <br /> Contractor . Such reasons shall consist of strikes, bankruptcy, discontinuance of <br /> manufacturer, or acts of God . <br /> 2 . The Contractor placed , or attempted to place, orders for the specified products <br /> within 10 days after Notice of Award . <br /> 3 . Request for substitution is made in writing to the Owner within 10 days of the <br /> date on which the Contractor ascertains that he cannot obtain the item specified . <br /> 4 . Complete data as set forth herein to permit complete analysis of the proposed <br /> substitution is submitted with the request . <br /> 01630-2 <br />