My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E . The Owner' s decision regarding evaluation of substitutions shall be considered final and <br /> binding . Requests for time extensions and additional costs based on submission of, <br /> acceptance of, or rejection of substitutions will not be allowed . All approved <br /> substitutions will be incorporated into the Agreement by Change Order . <br /> 1 . 06 CONTRACTOR' S REPRESENTATION <br /> A . In making formal request for substitution , Contractor represents that : <br /> 1 . He has investigated proposed product and has determined that it is equal to or <br /> superior in all respects to that specified . <br /> 2 . He will provide same warranties or bonds for substitution as for product <br /> specified . <br /> 3 . He will coordinate installation of accepted substitution into the Work, and will <br /> make such changes as may be required for the Work to be complete in all <br /> respects . <br /> 4 . He waives claims for additional costs caused by substitution which may <br /> subsequently become apparent. <br /> 5 . Cost data is complete and includes related costs under his Contract, but not : <br /> a. Costs under separate contracts . <br /> b . Engineer' s costs for redesign or revision of Contract Documents . <br /> PART 2 — PRODUCTS (NOT USED) <br /> PART 3 — EXECUTION (NOT USED) <br /> END OF SECTION <br /> 01630-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.