My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
test procedures submittals, modified to reflect actual conduct of the tests and the <br /> following additional infonnation : <br /> a . Copy of all test data sheets and results of lab analyses . <br /> b . Summary comparison of specified test and performance requirements <br /> versus actual test results . <br /> C . Should actual test results fail to meet specified test and performance <br /> requirements , describe action to be taken prior to re -testing equipment . <br /> 3 . Copies of the manufacturer' s field service technician ' s report summarizing the <br /> results of his/her initial inspection , operation , adjustment and pre-tests . The <br /> report shall include detailed descriptions and tabulations of the points inspected, <br /> tests and adjustments made , quantitative results obtained, suggestions for <br /> precautions to be taker' to ensure proper maintenance , and the equipment <br /> supplier's Certificate of Installation in the format specified herein . <br /> 1 . 04 REFERENCE STANDARDS <br /> A . American Water Works Association (AWWA) <br /> 1 . AWWA C653 - Disinfection for Water Treatment Plants . <br /> B . American Society for Testing and Materials (ASTM) <br /> C . Water Pollution Control Federation (WPCF) <br /> D . Where reference is made to one of the above standards, the revision in effect at the time <br /> of bid opening shall apply . <br /> 1 . 05 QUALITY ASSURANCE <br /> A . Field service technicians shall be competent and experienced in the proper installation , <br /> adjustment, operation , testing and startup of the equipment and systems being installed . <br /> B . Manufacturers ' sales and marketing personnel will not be accepted as field service <br /> technicians . <br /> PART 2 PRODUCTS (NOT USED) <br /> PART 3 EXECUTION <br /> 3 . 01 PRELIMINARY REQUIREMENTS <br /> A . After installation of the equipment has been completed and the equipment is presumably <br /> ready for operation , before it is operated by others, the manufacturer' s field service <br /> technician shall inspect, operate, test and adjust the equipment . The inspection shall <br /> include at least the following points where applicable : <br /> I . Soundness (without cracked or otherwise damaged parts) . <br /> 2 . Completeness in all details , as specified and required . <br /> 3 . Correctness of setting, alignment and relative arrangement of various parts . <br /> 4 . Adequacy and correctness of packing , sealing and lubricants . <br /> 01650 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.