Laserfiche WebLink
SECTION 00530 - EJCDC <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED PRICE <br /> THIS AGREEMENT ( "Agreement" or " Contract" ) datedlt c IA � , 2011 <br /> by and between Indian River County , a political subdivision of the State of Florida ( " OWNER " ) and <br /> Beemats , LLC ( " CONTRACTOR " ) . <br /> BACKGROUND RECITALS <br /> A . Pursuant to applicable provisions of Florida law , OWNER has selected CONTRACTOR to perform <br /> certain work as more specifically described in the Contract Documents on the terms set forth in the <br /> Contract Documents . <br /> B . CONTRACTOR agrees to perform certain work as more specifically described in the Contract <br /> Documents on the terms set forth in the Contract Documents . <br /> NOW THEREFORE , OWNER and CONTRACTOR , in consideration of the mutual covenants <br /> hereinafter set forth , and intending to be legally bound , agree as follows : <br /> ARTICLE 1 WORK <br /> 1 . 1 . CONTRACTOR as an independent contractor and not as an employee shall furnish and <br /> complete all of the necessary labor, material , and equipment to perform the work as specified or <br /> indicated in the Contract Documents . CONTRACTOR shall complete all work as specified or <br /> indicated in the Contract Documents . The work is generally described as follows , and shall include , <br /> but is not necessarily limited to the following : <br /> 1 . 1 . CONTRACTOR as an independent contractor and not as an employee shall furnish and <br /> complete all of the necessary labor , material , and equipment to perform the work as specified or <br /> indicated in the Contract Documents . CONTRACTOR shall complete all work as specified or <br /> indicated in the Contract Documents . The work is generally described as follows , and shall include , <br /> but is not necessarily limited to the following : <br /> The Contractor will furnish and install a Floating Kiat System ( FMS a . k . a . <br /> floating plant mats and all plant material as required by Indian River <br /> County and as depicted in the Contract Specifications , Engineering <br /> Plans and Details = 10200 . The Contractor will provide an <br /> Implementation Plan that maximizes the treatment efficiency of the <br /> floating plant mat, and provide sufficient quantity at strategic locations , <br /> in order to achieve a demonstrable net environmental benefit as defined <br /> in Permit FL166511 -002 - IW5A . At a minimum the floating plant mats will <br /> be located at the main points of ingress and egress to each of the major <br /> runnels . <br /> DESCRIPTION OF WORK RESPONSIBILITIES <br /> a . A FMS shall consist of buoyant marine foam of a heavy duty commercial grade material <br /> 00530 - 1 <br />