Laserfiche WebLink
k . The Contractor will provide the County with a map showing the areas where the <br /> floating plant mats have been installed , the size of the mat and an inventory of the <br /> plant material ( type & number ) installed during each billing period with every <br /> invoice . <br /> ARTICLE 2 ENGINEER <br /> 2 . 1 . The project has been designed by , Indian River County Department of Utility <br /> Services and hereinafter called the OWNER , assume all duties and responsibilities and have the <br /> rights and authority assigned in the Contract Documents in connection with completion of the work in <br /> accordance with the Contract Documents , <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 . Contract Times . The CONTRACTOR shall be substantially completed with the following <br /> timeframe <br /> ( a ) Within 30 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions prior to <br /> construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor , equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating construction . <br /> ( b ) From 31 calendar days to 60 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install the FMS . <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to their pre-construction condition . <br /> 4 . Correct all deficiencies noted by Engineer . <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a ) and b ) constitutes <br /> Substantial Completion . <br /> ( c ) From 61 calendar days to 75 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures . <br /> 3 . 2 . Completion of all tasks outlined above ( i . e . , Subparagraphs a , b , and c ) constitute <br /> Final Completion . <br /> 00530 - 3 <br />