Laserfiche WebLink
not involve a change in the Contract Price or the Contract duration of the activities comprising the Contractor ' s plan <br /> Times . to accomplish the Work within the Contract Times . <br /> 21 . General Requirements-- Sections of Division 1 of 33 . Project--The total construction of which the <br /> the Specifications . The General Requirements pertain to Work to be performed under the Contract Documents may <br /> all sections of the Specifications . be the whole, or a part. <br /> 22 . Hazardous Environmental Condition- -The 34 . Project Manual- -The bound documentary <br /> presence at the Site of Asbestos , PCBs, Petroleum , information prepared for bidding and constructing the <br /> Hazardous Waste , or Radioactive Material in Such Work . A listing of the contents of the Project Manual , <br /> quantities or circumstances that may present a substantial which may be bound in one or more volumes, is <br /> danger to persons or property exposed thereto in contained in the table ( s) of contents . <br /> connection with the Work . <br /> 35 . Radioactive Material-- Source , special nuclear, or <br /> 23 . Hazardous Waste- - The term Hazardous Waste byproduct material as defined by the Atomic Energy Act <br /> shall have the meaning provided in Section 1004 of the of 1954 (42 USC Section 2011 et seq . ) as amended <br /> from <br /> Solid Waste Disposal Act (42 USC Section 6903 ) as time to time . <br /> amended from time to time . <br /> 36 . Related Entity -- An officer, director, partner, <br /> 24 . Laws and Regulations, Laws or Regulations-- employee , agent, consultant, or subcontractor. <br /> Any and all applicable laws, rules, regulations , ordinanc - <br /> es , codes , and orders of any and all governmental bodies, 37 . Resident Project Representative--The authorized <br /> agencies, authorities , and courts having jurisdiction . representative of Engineer who may be assigned to the <br /> Site or any part thereof. <br /> 25 . Liens--Charges , security interests, or <br /> encumbrances upon Project funds, real property, or 38 . Samples--Physical examples of materials, <br /> personal property . equipment, or workmanship that are representative of <br /> some portion of the Work and which establish the <br /> 26 . Milestone--A principal event specified in the standards by which such portion of the Work <br />will be <br /> Contract Documents relating to an intermediate comple- judged . <br /> tion date or time prior to Substantial Completion of all the <br /> Work . 39 . Schedule of Submittals--A schedule , prepared <br /> and maintained by Contractor, of required submittals and <br /> 27 . Notice of Award--The written notice by Owner the time requirements to support scheduled performance <br /> to the Successful Bidder stating that upon timely of related construction activities . <br /> compliance by the Successful Bidder with the conditions <br /> precedent listed therein , Owner will sign and deliver the 40 . Schedule of Values--A schedule, prepared and <br /> Agreement . maintained by Contractor, allocating portions of the <br /> Contract Price to various portions of the Work and used <br /> 28 . Notice to Proceed--A written notice given by as the basis for reviewing Contractor ' s Applications for <br /> Owner to Contractor fixing the date on which the Con - Payment. <br /> tract Times will commence to run and on which <br /> Contractor shall start to perform the Work under the 41 . Shop Drawings- -All drawings , diagrams <br />, <br /> Contract Documents . illustrations, schedules, and other data or information <br /> which are specifically prepared or assembled by or for <br /> 29 . Owner--The individual or entity with whom Contractor and submitted by Contractor to illustrate some <br /> Contractor has entered into the Agreement and for whom portion of the Work . <br /> the Work is to be performed . <br /> 42 . Site--Lands or areas indicated in the Contract <br /> 30 . PCBs- -Polychlorinated biphenyls . Documents as being furnished by Owner upon which the <br /> Work is to be performed , including rights-of-way and <br /> 31 . Petroleum--Petroleum , including crude oil or any easements for access thereto, and Such other lands <br /> fraction thereof which is liquid at standard conditions of furnished by Owner which are designated for the use of <br /> temperature and pressure (60 degrees Fahrenheit and 14 . 7 Contractor. <br /> pounds per square inch absolute) , such as oil , petroleum , <br /> fuel oil , oil sludge , oil refuse, gasoline , kerosene , and oil <br /> mixed with other non -Hazardous Waste and crude oils . <br /> 32 . Progress Schedule--A schedule, prepared and <br /> maintained by Contractor, describing the sequence and <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 7 <br />