43 . Specifications--That part of the Contract Engineer ordering an addition, deletion , or revision in the <br /> Documents consisting of written, requirements for Work, or responding to differing or unforeseen subsurface <br /> materials , equipment, systems , standards and or physical conditions under which the Work is to be <br /> workmanship as applied to the Work , and certain performed or to emergencies . A Work Change Directive <br /> administrative requirements and procedural matters will not change the Contract Price or the Contract Times <br /> applicable thereto . but is evidence that the parties expect that the change <br /> ordered or documented by a Work Change Directive will <br /> be incorporated in a subsequently issued Change Order <br /> 44 . Subcontractor- - An individual or entity having a following negotiations by the parties as to its effect, <br /> if <br /> direct contract with Contractor or with any other any , on the Contract Price or Contract Times . <br /> Subcontractor for the performance of a part of the Work <br /> at the Site . 1 . 02 Terminology <br /> 45 . Substantial Completion--The time at which the A . The following words or terms are not defined but, <br /> Work (or a specified part thereof) has progressed to the when used in the Bidding Requirements or Contract <br /> point where, in the opinion of Engineer, the Work (or a Documents , have the following meaning. <br /> specified part thereof) is sufficiently complete , in <br /> accordance with the Contract Documents , so that the B . Intent of Certain Terms or Adjectives <br /> Work (or a specified part thereof) can be utilized for the <br /> purposes for which it is intended . The terms "substantially 1 . The Contract Documents include the terms "as <br /> complete" and "substantially completed" as applied to all allowed , " "as approved , " "as ordered ", "as directed " <br /> or part of the Work refer to Substantial Completion or terms of like effect or import to <br /> authorize an <br /> thereof exercise of professional judgment by Engineer. In <br /> addition , the adjectives "reasonable, " "suitable ," <br /> 46 . Successful Bidder-- The Bidder submitting a "acceptable, " "proper, " "satisfactory, " or adjectives <br /> responsive Bid to whom Owner makes an award . of like effect or import are used to describe an action <br /> or determination of Engineer as to the Work . It is <br /> 47 . Supplementary Conditions--That part of the intended that such exercise of professional judgment, <br /> Contract Documents which amends or supplements these action or determination will be solely to evaluate, in <br /> General Conditions. general , the Work for compliance with the require- <br /> ments of and information in the Contract Documents <br /> 48 . Supplier--A manufacturer, fabricator, supplier, and conformance with the design concept of the com - <br /> distributor, materialman , or vendor having a direct pleted Project as a functioning whole as shown or <br /> contract with Contractor or with any Subcontractor to indicated in the Contract Documents (unless there is <br /> furnish materials or equipment to be incorporated in the a specific statement indicating otherwise) . The use of <br /> Work by Contractor or any Subcontractor. any such term or adjective is not intended to and shall <br /> not be effective to assign to Engineer any duty or <br /> 49 . Underground Facilities--All underground authority to supervise or direct the performance of <br /> pipelines , conduits , ducts , cables, wires, manholes, vaults , the Work or any duty or authority to undertake <br /> tanks, tunnels , or other such facilities or attachments, and responsibility contrary to the provisions of Paragraph <br /> any encasements containing such facilities, including 9 . 09 or any other provision of the Contract <br /> those that convey electricity , gases, steam , liquid Documents . <br /> petroleum products, telephone or other communications , <br /> cable television , water, wastewater, storm water, other C . Day <br /> liquids or chemicals , or traffic or other control systems . <br /> I . The word "day" means a calendar day of 24 <br /> 50 . Unit Price Work-- Work to be paid for on the hours measured from midnight to the next <br /> basis of unit prices . midnight. <br /> 51 . Work--The entire construction or the various D . Defective <br /> separately identifiable parts thereof required to be <br /> provided under the Contract Documents . Work includes 1 . The word "defective , " when modifying the word <br /> and is the result of performing or providing all labor, " Work , " refers to Work that is unsatisfactory, <br /> services, and documentation necessary to produce such faulty, or deficient in that it : <br /> construction , and furnishing, installing, and incorporating <br /> all materials and equipment into such construction , all as a . does not conform to the Contract Documents , <br /> required by the Contract Documents . or <br /> 52 . Work Change Directive--A written statement to b . does not meet the requirements of any <br /> Contractor issued on or after the Effective Date of the applicable inspection , reference standard , test, or <br /> Agreement and signed by Owner and recommended by <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 8 <br />