My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval referred to in the Contract Documents , �eetrtele <br /> or to �l s�aa� Baa rin-ire ae�ordance with-Article 5 . <br /> c . has been damaged prior to Engineer ' s - 2 . 02 Copies of Documents <br /> recommendation of final payment (unless <br /> responsibility for the protection thereof has been A . Owner shall furnish to Contractor up to ten printed or <br /> assumed by Owner at Substantial Completion in hard copies of the Drawings and Project Manual . <br /> accordance with Paragraph 14 . 04 or 14 . 05 ) . Additional copies will be furnished upon request at the <br /> cost of reproduction . <br /> 2 . 03 Commencement of Contract Times; Notice to <br /> Proceed <br /> E . Furnish, Install, Perform, Provide <br /> A�13e-C `Fi•rrtc��rEi-e�rr��ar�®�-to-�rrrrerr <br /> 1 . The word " furnish , " when used in connection thirtieth day after the Effective Date of the eement or, <br /> with services, materials , or equipment, shall mean to if a Notice to Proceed is given , on �th day indicated in the <br /> supply and deliver said services, materials, or Notice to Proceed . A Notices oceed may be given at <br /> equipment to the Site (or some other specified any time within 30 day ter the Effective Date of the <br /> location) ready for use or installation and in usable or Agreement . In n ent will the Contract Times coin - <br /> operable condition . mence to r ater than the sixtieth day after the day of <br /> Bid Ing or the thirtieth day after the Effective Date of <br /> 2 . The word " install ," when used in connection is earlier. <br /> with services, materials , or equipment, shall mean to <br /> put into use or place in final position said services , 2 . 04 Starting the Work <br /> materials, or equipment complete and ready for <br /> intended use . A . Contractor shall start to perform the Work on the date <br /> when the Contract Times commence to run . No Work <br /> 3 . The words "perform " or "provide, " when used in shall be done at the Site prior to the date on which the <br /> connection with services, materials, or equipment, Contract Times commence to run . <br /> shall mean to furnish and install said services, <br /> materials, or equipment complete and ready for 2 . 05 Before Starting Construction <br /> intended use. <br /> A . Preliminary Schedules: Within 10 days after the <br /> 4 . When "furnish , " " install , " "perform , " or "pro- Effective Date of the Agreement (unless otherwise speci - <br /> vide" is not used in connection with services, Pied in the General Requirements), Contractor shall <br /> materials , or equipment in a context clearly requiring submit to Engineer for timely review : <br /> an obligation of Contractor, "provide" is implied . <br /> 1 . a preliminary Progress Schedule ; indicating the <br /> F . Unless stated otherwise in the Contract Documents, times ( numbers of days or dates) for starting and <br /> words or phrases which have a well -known technical or completing the various stages of the Work, including <br /> construction industry or trade meaning are used in the any Milestones specified in the Contract Documents ; <br /> Contract Documents in accordance with such recognized <br /> meaning . 2 . a preliminary Schedule of Submittals ; and <br /> 3 . a preliminary Schedule of Values for all of the <br /> ARTICLE 2 - PRELIMINARY MATTERS Work which includes quantities and prices of items <br /> which when added together equal the Contract Price <br /> and subdivides the Work into component parts in <br /> 2 . 01 Delivery of Bonds and Evidence oflnsurance sufficient detail to serve as the basis for progress <br /> payments during performance of the Work. Such <br /> whew-C-oat�acter delivers=t � �aee �AAeprices will include an appropriate amount of <br /> the Agreement to Owner, Contractor shall also deto overhead and profit applicable to each item of Work . <br /> Owner such bonds as Contractor may be re ed to <br /> furnish . 2 . 06 Preconstruction Conference <br /> B . Evidence oflnsurance: ore any Work at the Site is A . Before any Work at the Site is started , a conference <br /> started , Contractor a weer shall each deliver to the attended by Owner, Contractor, Engineer, and others as <br /> other, with co o each additional insured identified in appropriate will be held to establish a working <br /> the Supp entary Conditions , certificates of insurance understanding among the parties as to the Work and to <br /> ( an . er evidence of insurance which either of them or discuss the schedules referred to in Paragraph 2 . 05 . A , <br /> MahigDish procedures for handling Shop Drawings and other <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC . All rights reserved. <br /> 00700 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.