submittals , processing Applications for Payment, and <br /> maintaining required records . 3 . 02 Reference Standards <br /> 2 . 07 Initial Acceptance of Schedules A . Standards , Specifications , Codes , Laws, and <br /> A . At least 10 days before submission of the first Regulations <br /> Application for Payment a conference attended by 1 . Reference to standards, specifications , manuals, <br /> Contractor, Engineer, and others as appropriate will be or codes of any technical society , organization , or <br /> held to review for acceptability to Engineer as provided association , or to Laws or Regulations , whether such <br /> below the schedules submitted in accordance with reference be specific or by implication , shall mean <br /> Paragraph 2 . 05 . A . Contractor shall have an additional 10 the standard , specification , manual , code , or Laws or <br /> days to make corrections and adjustments and to complete Regulations in effect at the time of opening of Bids <br /> and resubmit the schedules . No progress payment shall be ( or on the Effective Date of the Agreement if there <br /> made to Contractor until acceptable schedules are were no Bids), except as may be otherwise <br /> submitted to Engineer. specifically stated in the Contract Documents . <br /> 1 . The Progress Schedule will be acceptable to 2 . No provision of any such standard , specification <br />, <br /> Engineer if it provides an orderly progression of the manual or code, or any instruction of a Supplier shall <br /> Work to completion within the Contract Times . Such be effective to change the duties or responsibilities of <br /> acceptance will not impose on Engineer responsibil - Owner, Contractor, or Engineer, or any of their <br /> ity for the Progress Schedule , for sequencing, subcontractors, consultants, agents, or employees <br /> scheduling, or progress of the Work nor interfere from those set forth in the Contract Documents . <br />No <br /> with or relieve Contractor from Contractor ' s full such provision or instruction shall be effective <br /> to <br /> responsibility therefor. assign to Owner, or Engineer, or any of, their Related <br /> Entities, any duty or authority to supervise or direct <br /> 2 . Contractor ' s Schedule of Submittals will be the performance of the Work or any duty or authority <br /> acceptable to Engineer if it provides a workable to undertake responsibility inconsistent with the <br /> arrangement for reviewing and processing the provisions of the Contract Documents . <br /> required submittals . <br /> 3 . Contractor ' s Schedule of Values will be accept- <br /> 3 . 03 Reporting and Resolving Discrepancies <br /> able to Engineer as to form and substance if it A . Reporting Discrepancies <br /> provides a reasonable allocation of the Contract Price <br /> to component parts of the Work . 1 . Contractor 's Review of Contract Documents <br /> Before Starting Work: Before undertaking each part <br /> of the Work, Contractor shall carefully study and <br /> ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, compare the Contract Documents and check and <br /> AMENDING , REUSE verify pertinent figures therein and all applicable <br /> field measurements . Contractor shall promptly report <br /> in writing to Engineer any conflict, error, ambiguity, <br /> 3 . 01 Intent or discrepancy which Contractor may discover and <br /> shall obtain a written interpretation or clarification <br /> A . The Contract Documents are complementary ; what is from Engineer before proceeding with any Work <br /> required by one is as binding as if required by all . affected thereby . <br /> B . It is the intent of the Contract Documents to describe a 2 . Contractor 's Review of Contract Documents <br /> functionally complete Project ( or part thereof) to be During Performance of Work: If, during the <br /> constructed in accordance with the Contract Documents . performance of the Work, Contractor discovers any <br /> Any labor, documentation , services, materials, or equip- conflict, error, ambiguity , or discrepancy within the <br /> ment that may reasonably be inferred from the Contract Contract Documents or between the Contract Docu - <br /> Documents or from prevailing custom or trade usage as ments and any provision of any Law or Regulation <br /> being required to produce the intended result will be applicable to the performance of the Work or of any <br /> provided whether or not specifically called for at no standard , specification , manual or code, or of any <br /> additional cost to Owner. instruction of any Supplier, Contractor shall promptly <br /> report it to Engineer in writing. Contractor shall not <br /> C . Clarifications and interpretations of the Contract proceed with the Work affected thereby (except in an <br /> Documents shall be issued by Engineer as provided in emergency as required by Paragraph 6 . 16 . A ) until an <br /> Article 9 . amendment or supplement to the Contract <br /> Documents has been issued by one of the methods <br /> indicated in Paragraph 3 . 04 . <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 10 <br />