My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Contractor shall afford each other contractor who is a disruption costs incurred by Contractor as a result of the <br /> party to such a direct contract, each utility owner and other contractor ' s actions or inactions . <br /> Owner, if Owner is performing other work with Owner ' s <br /> employees, proper and safe access to the Site, a reason - C . Contractor shall be liable to Owner and any other <br /> able opportunity for the introduction and storage of contractor for the reasonable direct delay and disruption <br /> materials and equipment and the execution of such other costs incurred by such other contractor as a result of <br /> work, and shall properly coordinate the Work with theirs . Contractor ' s action or inactions . <br /> Contractor shall do all cutting, fitting, and patching of the <br /> Work that may be required to properly connect or <br /> otherwise make its several parts come together and ARTICLE 8 - OWNER ' S RESPONSIBILITIES <br /> properly integrate with such other work . Contractor shall <br /> not endanger any work of others by cutting, excavating, <br /> or otherwise altering their work and will only cut or alter 8 . 01 Communications to Contractor <br /> their work with the written consent of Engineer and the <br /> others. whose work will be affected . The duties and A . Except. as otherwise provided in these General Condi - <br /> responsibilities of Contractor under this Paragraph are for tions, Owner shall issue all communications to Contractor <br /> the benefit of such utility owners and other contractors to through Engineer. <br /> the extent that there are comparable provisions for the <br /> benefit of Contractor in said direct contracts between 8 . 02 Replacement of Engineer <br /> Owner and such utility owners and other contractors . <br /> �--lay-o�se-of=tetax�+taaki�ta-oche-®t�plo�naent o�{�tar, <br /> C . If the proper execution or results of any part of Owner shall appoint an engineer t whotrreun7ractor <br /> Contractor' s Work depends upon work performed by makes no rea fable o ectton , whose status under the <br /> others under this Article 7 , Contractor shall inspect such GICM .r-acGt-D menu-shall-be-tha>-of-the-former-Engineer. <br /> other work and promptly report to Engineer in writing any <br /> delays, defects, or deficiencies in such other work that 8 . 03 Furnish Data <br /> render it unavailable or unsuitable for the proper <br /> execution and results of Contractor ' s Work . Contractor' s A . Owner shall promptly ftimish the data required of <br /> failure to so report will constitute an acceptance of such Owner under the Contract Documents . <br /> other work as fit and proper for integration with <br /> Contractor' s Work except for latent defects and 8 . 04 Pay When Due <br /> deficiencies in such other work . <br /> A-Owner-shall-make-payments-to-Gentraetor--when-they <br /> 7 . 02 Coordination are-due-as-provided-in-Raragraphs- i•4. 02-Cand-1.4:07:C: <br /> A . If Owner intends to contract with others for the 8 . 05 Lands and Easements; Reports and Tests <br /> performance of other work on the Project at the Site, the <br /> following will be set forth in Supplementary Conditions : A . Owner ' s duties in respect of providing lands and <br /> easements and providing engineering surveys to establish <br /> 1 . the individual or entity who will have authority reference points are set forth in Paragraphs 4 . 01 and 4 . 05 . <br /> and responsibility for coordination of the activities Paragraph 4 . 02 refers to Owner ' s identifying and making <br /> among the various contractors will be identified ; available to Contractor copies of reports of explorations <br /> and tests of subsurface conditions and drawings of <br /> 2 . the specific matters to be covered by such physical conditions in or relating to existing surface or <br /> authority and responsibility will be itemized ; and Subsurface structures at or contiguous to the Site that have <br /> been utilized by Engineer in preparing the Contract <br /> 3 . the extent of such authority and responsibilities Documents . <br /> will be provided . <br /> B . Unless otherwise provided in the Supplementary 8 . 06 Insurance <br /> Conditions, Owner shall have sole authority and respon - A� -Owner's-responsibil,itiesT i•f--any;_ i_n-respec�to-pur- <br /> sibility for such coordination . chasing and d maiutamrng-liabilify and property insurance <br /> 7 . 03 Legal Relationships <br /> ari"-set-forth-in Article 5 . <br /> A . Paragraphs 7 . 01 .A and 7 . 02 are not applicable for 8 . 07 Change Orders <br /> utilities not under the control of Owner. A . Owner is obligated to execute Change Orders as <br /> B . Each other direct contract of Owner under Paragraph indicated in Paragraph 10 . 03 . <br /> 7 . 0I .A shall provide that the other contractor is liable to <br /> Owner and Contractor for the reasonable direct delay and <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.