My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 . 08 Inspections, Tests, and Approvals check the quality or quantity of the Work . Engineer ' s <br /> efforts will be directed toward providing for Owner a <br /> A . Owner ' s responsibility in respect to certain inspec. greater degree of confidence that the completed Work will <br /> tions , tests , and approvals is set forth in Paragraph conform generally to the Contract Documents . On the <br /> 13 . 03 . B . basis of such visits and observations, Engineer will keep <br /> Owner informed of the progress of the Work and will <br /> 8 . 09 Limitations on Owner 's Responsibilities endeavor to guard Owner against defective Work . <br /> A . The Owner shall not Supervise , direct, or have control <br /> B . Engineer ' s visits and observations are subject to all <br /> or authority over, nor be responsible for, Contractor ' s the limitations on Engineer ' s authority and responsibility <br /> means, methods , techniques , sequences, or procedures of set forth in Paragraph 9 . 09 . Particularly, but without <br /> construction , or the safety precautions and programs limitation , during or as a result of Engineer's visits or <br /> incident thereto, or for any failure of Contractor to <br /> comply with Laws and Re ulations a licable to the observations of Contractors Work Engineer will not <br /> g pp supervise, direct, control , or have authority over or be <br /> performance of the Work . Owner will not be responsible responsible for Contractor ' s means, methods, techniques, <br /> for Contractor ' s failure to perform the Work in sequences, or procedures of construction , or the safety <br /> accordance with the Contract Documents . precautions and programs incident thereto, or for any <br /> failure of Contractor to comply with Laws and <br /> 8 . 10 Undisclosed Hazardous Environmental Regulations applicable to the performance of the Work. <br /> Condition <br /> A . Owner ' s responsibility in respect to an undisclosed 9 . 03 Project Representative <br /> Hazardous Environmental Condition is set forth in A . If Owner and Engineer agree, Engineer will furnish a <br /> Paragraph 4 . 06 . Resident Project Representative to assist Engineer in <br /> providing more extensive observation of the Work . The <br /> 8 . 11 Evidence of Financial Arrangements authority and responsibilities of any such Resident Project <br /> Representative and assistants will be as provided in the <br /> A:IFand-to-the-extent Owner-has-ag-reedctoefitm ' I Supplementary Conditions , and limitations on the <br /> Contractor reasonable evidence that Dwane a _ responsibilities thereof will be as provided in Paragraph <br /> arrangements have been�to d�tis Owner ' s <br /> fY 9 . 09 . if Owner designates another representative or agent <br /> obligations and theontract Documents, Owner ' s to represent Owner at the Site who is not Engineer ' s <br /> rees,�onsibTli yI` in respect thereof will be as set forth in the consultant, agent or employee, the responsibilities and <br /> " Supplementary Conditions: authority and limitations thereon of such other individual <br /> or entity will be as provided in the Supplementary <br /> ARTICLE 9 - ENGINEER ' S STATUS DURING Conditions . <br /> CONSTRUCTION 9 . 04 Authorized Variations in Work <br /> A . Engineer may authorize minor variations in the Work <br /> 9 . 01 Owner 's Representative from the requirements of the Contract Documents which <br /> do not involve an adjustment in the Contract Price or the <br /> A . Engineer will be Owner ' s representative during the Contract Times and are compatible with the design <br /> construction period . The duties and responsibilities and concept of the completed Project as a functioning whole <br /> the limitations of authority of Engineer as Owner ' s as indicated by the Contract Documents . These may be <br /> representative during construction are set forth in the accomplished by a Field Order and will be binding on <br /> Contract Documents and will not be changed without Owner and also on Contractor, who shall perform the <br /> written consent of Owner and Engineer . Work involved promptly .;Jf-0wl �er-�c��try� s <br /> thaw-Field-Order_justi.fes-an_adj.ustment i.n-the Contract <br /> 9 . 02 Visits to Site • Price-or Contraet Times;or-both;and-the-parties-are <br /> unable-to-agree-on-entitlement to-or on-the-amount�er <br /> A . g ��=w`il4-mare-visits-to tT� 4 �rter ls— extent;-if-any eef� any-such-adjustment;a-Glaim-may-be <br /> appropriate-to-the-various••stages-of con struetion-as made therefor-as-provided-in-Paragraph-1-0 05 . <br /> E-ngi neer-deems-neeessary-in-order-to-obser-ve-as-an <br /> &*p@r-i d-and-quala.fed-desi.g>a_prafe&sional-the 9 . 05 Rejecting Defective Work <br /> progress�that has-been-made-and-the-quality-of-the-various <br /> aspeets.of_Gontractor=s.exeeuted_Work . Based on A . Engineer will have authority to reject Work which <br /> information obtained during such visits and observations , Engineer believes to be defective , or that Engineer <br /> Engineer, for the benefit of Owner, will determine, in believes will not produce a completed Project that <br /> general , if the Work is proceeding in accordance with the conforms to the Contract Documents or that will prejudice <br /> Contract Documents . Engineer will not be required to the integrity of the design concept of the completed <br /> make exhaustive or continuous inspections on the Site to Project as a functioning whole as indicated by the <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700 - 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.