Laserfiche WebLink
Contract Documents . Engineer will also have authority to C . Engineeris-wr-itten-decision-elt �uil�- <br /> the issue-referred <br /> require special inspection or testing of the Work as be final andY binding-oriQwner-an-d-o ctor, subject to <br /> provided in Paragraph 13 . 04, whether or not the Work is <br /> fabricated , installed , or completed . rovtsronsrofParagraph-10:05 . <br /> 9 . 06 Shop Drawings, Change Orders and Payments D . When"futa6tior.ring-as interpreter.a.rad j.Hidge.-under44is <br /> Y Paragraph 9 . 08 , Engineer will not s�ho�' partrality to <br /> Owner or Contractor an wjl of be liable in connection <br /> A . In connection with Engineer ' s authority, and with any ipte . ation or decision rendered in good faith <br /> limitations thereof, as to Shop Drawings and Samples, seen L`ie -ca.pa&ity. <br /> Paragraph 6 . 17 . <br /> 9 . 09 Limitations on Engineer 's Aatthority and <br /> B . In connection with Engineer ' s authority, and Responsibilities <br /> limitations thereof, as to design calculations and design <br /> drawings submitted in response to a delegation of A . Neither Engineer ' s authority or responsibility under <br /> professional design services, if any, see Paragraph 6 . 21 . this Article 9 or under any other provision of the Contract <br /> C . In connection with Engineer ' s authority as to ChanDocuments nor any decision made by Engineer in good <br /> ge faith either to exercise or not exercise such authority or <br /> Orders , see Articles 10 , 11 , and 12 . responsibility or the undertaking, exercise, or <br /> D . In connection with Engineer ' s authorit to performance of any authority or responsibility by <br /> Y as Engineer shall create, impose, or give rise to any duty in <br /> Applications for Payment, see Article 14 . contract, tort, or otherwise owed by Engineer to <br /> Contractor, any Subcontractor, any Supplier, any other <br /> 9 . 07 Determinations for Unit Price Work individual or entity , or to any surety for or employee or <br /> A . Engineer will determine the actual quantities and agent of any of them . <br /> classifications of Unit Price Work performed by B . Engineer will not supervise, direct, control , or have <br /> Contractor. Engineer will review with Contractor the authority over or be responsible for Contractor ' s means, <br /> Engineer' s preliminary determinations on such matters methods, techniques, sequences , or procedures of <br /> before rendering a written decision thereon (by construction , or the safety precautions and programs <br /> recommendation of an Application for Payment or incident thereto, or for any failure of Contractor to <br /> otherwise) . Engineer ' s written decision thereon will be comply with Laws and Regulations applicable to the <br /> final and binding ( except as modified by Engineer to performance of the Work. Engineer will not be respon- <br /> reflect changed factual conditions or more accurate data) sible for Contractor ' s failure to perform the Work in <br /> upon Owner and Contractor, subject to the provisions of accordance with the Contract Documents . <br /> Paragraph 10 . 05 , <br /> C . Engineer will not be responsible for the acts or <br /> 9 . 08 Decisions on Requirements of Contract omissions of Contractor or of any Subcontractor, any <br /> Documents and Acceptability of Work Supplier, or of any other individual or entity performing <br /> A . Engineer will be the initial interpreter of the any of the Work . <br /> requirements of the Contract Documents and judge of the D . Engineer ' s review of the final Application for Payment <br /> acceptability of the Work thereunder. and accompanying documentation and all maintenance <br /> ..question-and-other_ma.tters-betaveen-owner. and.-Contractor and operating instructions, schedules, guarantees, bonds, <br /> ar.isi.n.g_priorto-the-date_fina.l-pay-inen4 i-s-due-rG1ati•ng to certificates of inspection , tests and approvals, and other <br /> the-aeeeptabil•ity-of the-Work-and-the-interpretation-of_the documentation required to be delivered by Paragraph <br /> requirements-af-the-C-entr-act Documents-pertaining-to-tl e 14 . 07 .A will only be to determine generally that their <br /> per-for-mance-of-the "Work;will-be-re- fer-red-initially-to content complies with the requirements of, and in the case <br /> Engineer-in-writing-within 30-days-ef the-event giving-rise of certificates of inspections, tests , and approvals that the <br /> •te4he•questie+l results certified indicate compliance with the Contract <br /> Documents . <br /> B . Engineer will , with reasonable promptness, render a <br /> written decision on the issue referred . if Owner or E . The limitations upon authority and responsibility set <br /> Contractor believe that any such decision entitles them to forth in this Paragraph 9 . 09 shall also apply to, the <br /> an adjustment in the Contract Price or Contract Times or Resident Project Representative, if any, and assistants, if <br /> both , a Claim may be made under Paragraph 10 . 05 . The any . <br /> date of Engineer ' s decision shall be the date of the event: <br /> giving rise to the issues referenced for the purposes of <br /> Paragraph 10 . 05 . 13 . <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 0 2002 National Society of Professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 28 <br />