My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 10 - CHANGES IN THE WORK ; CLAIMS <br /> 10 . 04 Notification to Surety <br /> A . If notice of any change affecting the general scope of <br /> 10 . 01 Authorized Changes in the Work the Work or the provisions of the Contract Documents <br /> (including, but not limited to, Contract Price or Contract <br /> A . Without invalidating the Contract and without notice Times) is required by the provisions of any bond to be <br /> to any surety , Owner may , at any time or from time to given to a surety , the giving of any such notice will be <br /> time, order additions , deletions , or revisions in the Work Contractor ' s responsibility . The amount of each <br /> by a Change Order , or a Work Change Directive . Upon applicable bond will be adjusted to reflect the effect of <br /> receipt of any such document, Contractor shall promptly any such change. <br /> proceed with the Work involved which will be performed <br /> under the applicable conditions of the Contract 10 . 05 Claims <br /> Documents (except as otherwise specifically provided) . <br /> A:Engineer-s De�ision 'egudxedlll r laims except <br /> B . If Owner and Contractor are unable to agree on those waived pursuant to Paragraph 14 . 0 hall"be <br /> entitlement to, or on the amount or extent, if any , of an referred to the Engineer for decis��i na°-A decision by <br /> adjustment in the Contract Price or Contract Times, or Engineer shall be require as�rcondition precedent to any <br /> both , that should be allowed as a result of a Work Change exercise by Ower-or ontractor of any rights or remedies <br /> Directive, a Claim may be made therefor as provided in either may$Iherwise have under the Contract Documents <br /> Paragraph 10 . 05 . .o>ub_y awsand..Regulations in respect ofsuch_Claims. <br /> 10 . 02 Unauthorized Changes in the Work $ , � <br /> f <br /> each Claim shall be delivered by the claimant to E neer <br /> A . Contractor shall not be entitled to an increase in the; and the other party to the Contract promptly (bu n no <br /> Contract Price or an extension of the Contract Times with event later than 30 days) after the start of the ent giving <br /> respect to any work performed that is not required by the rise thereto . The responsibility to substanti e a Claim <br /> Contract Documents as amended, modified, or shall rest with the party making the Clai Notice of the <br /> supplemented as provided in Paragraph 3 . 04 , except in the amount or extent of the Claim , with s porting data shall <br /> case of an emergency as provided in Paragraph 6 . 16 or in be delivered to the Engineer and th other party to the <br /> the case of uncovering Work as provided in Paragraph Contract within 60 days after the art of such event <br /> 13 . 04 . 13 . (unless Engineer allows additii mal time for claimant to <br /> submit additional or more a 6urate data in support of such <br /> 10 . 03 Execution of Change Orders Claim) . A Claim for an astment in Contract Price shall <br /> be prepared in accorda . with the provisions of <br /> A . Owner and Contractor shall execute appropriate Paragraph 12 . 01 . 8 laim for an adjustment in Contract <br /> Change Orders recommended by Engineer covering : Time shall be pre,pp red in accordance with the provisions <br /> of Paragraph 12sb2 .B . Each Claim shall be accompanied <br /> 1 . changes in the Work which are : ( i ) ordered by by claimantl'ritten statement that the adjustment <br /> Owner pursuant to Paragraph 10 . 01 . A, (ii) required claimed is the entire adjustment to which the claimant <br /> because of acceptance of defective Work under believe sit is entitled as a result of said event . The <br /> Paragraph 13 . 08 . A or Owner ' s correction of oppo ing party shall submit any response to Engineer and <br /> defective Work under Paragraph 13 . 09 , or ( iii) agreed th claimant within 30 days after receipt of the claimant ' s <br /> to by the parties ; l -subm•i•ttal-Fun•4®ss Fnginee allow s-additional-time. <br /> 2 . changes in the Contract Price or Contract Times Crrgcrree�^=s54et�ewgi>3ee�-�y� lj �� � <br /> which are agreed to by the parties, including any and , within 30 days after receipt of the last submitt 1 <br /> of <br /> undisputed sum or amount of time for Work actually the claimant or the last submittal of the opposi �rty , if <br /> performed in accordance with a Work Change any, take one of the following actions in w r ing : <br /> Directive ; and <br /> l . deny the Claim in whole n part, <br /> 3-`—�elrarrges�-i�-tdae�e�•tt• =is®-e�C_e��ast-�Fiaaa�- <br /> which embody the substance of any written e ion 2 . approve the Clai r <br /> rendered by Engineer pursuant to Pa e00 <br /> 10 . 05 ; <br /> provided that, in lieu of executin ny such Change 3 . notify the mrties that the Engineer is unable to <br /> Order, an appeal may bet from any such deci - resXthem if, in the Engineer ' s sole discretion , <br /> sion in accordance ith the provisions of the it ppropriate for the Engineer to do so . <br /> Contract Doct nts and applicable Laws and Fof further resolution of the Claim , such <br /> Regulation� , Lit during any such appeal , Contractor +�ti(h�' n <br /> sha Carry on the Work and adhere to the Progress <br /> - �hgctute'asprovided-tn-Paragraplr6-1-8:/�: <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright © 2002 National Society of professional Engineers for EJCDC. All rights reserved . <br /> 00700 - 29 <br />