My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-051
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2016 1:43:27 PM
Creation date
10/1/2015 1:46:27 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/01/2011
Control Number
2011-051
Agenda Item Number
12.J.1
Entity Name
Beemats LLC
Subject
Floating Mat System
Area
Spoonbill Marsh Wetland Facility
Project Number
2785
Bid Number
2011029
Supplemental fields
SmeadsoftID
9309
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC 4 . 01A Delete existing paragraph 4 . 01A of the General Conditions in its entirety and replace it with the <br /> following : <br /> A . Owner shall furnish the site . <br /> SC 4 . 0113 Delete existing subparagraph 4 . 0113 of the General Conditions in its entirety <br /> SC 4 . 011) . Add the following after paragraph 4 . 01C of the General Conditions : <br /> D . Contractor shall provide to the Owner written evidence of authorization to use any private land for staging or <br /> storage of material and equipment on the private land . Such written evidence of authorization must be provided to <br /> the Owner prior to use of the private land . <br /> SC 4 . 02A Delete 4 . 02 A . 1 of the General Conditions in its entirety and replace it with the following : <br /> A . Reports and Drawings : The Contract Documents may identify those reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Contract Documents . <br /> Engineer has relied upon the data obtained from subsurface investigations made at the site in the form of test <br /> borings . Such data is in the form of boring logs , which are available upon request . The locations of the test borings <br /> are indicated on the Drawings . Such logs and samples are not part of the Contract Documents . <br /> SC 4 . 02A . 2 . Add the following new sentences immediately at the end of existing paragraph 4 . 02A . 2 . of the <br /> General Conditions which is to read as follows : <br /> In the preparation of Drawings and Specifications ., the Engineer has relied upon the reports listed in Section 00200 <br /> and tests of subsurface physical conditions at the site . Copies of these reports are available upon request. The <br /> foregoing information and data shown or indicated in the Contract Documents is based on information and data <br /> fiimished to Owner or the Engineer by others . The Owner and Engineer shall not be responsible for the accuracy or <br /> completeness of any such information or data, and the Contractor shall have full responsibility for requesting, <br /> reviewing, and checking all such information and data . <br /> SC -4 . 02B . Delete paragraph 4 . 02 b in its entirety and replace with the following : <br /> The information and data shown or indicated in the Contract Documents with respect to Underground Facilities <br /> owned by others or contiguous to the site is based on information and data furnished to Owner or the Engineer by <br /> the owners of such Underground Facilities or by others . The Owner and Engineer shall not be responsible for the <br /> accuracy or completeness of any such information or data, and the Contractor shall have full responsibility for <br /> reviewing and checking all such information and data , and the CONTRACTOR shall have full responsibility for <br /> physical conditions , and Underground Facilities owned by OWNER or others, shown or indicated in the Contract <br /> Documents . <br /> SC 4 . 02C , D , and E . Add new paragraphs C , D , and E immediately after Paragraph 4 . 02B of the General <br /> Conditions to read as follows : <br /> C . Field Measurements : Before undertaking each part of the construction , CONTRACTOR shall carefully study <br /> and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable <br /> field measurements . CONTRACTOR shall promptly report in writing to the OWNER and conflict, error or <br /> discrepancy which CONTRACTOR or any of his Subcontractors or Suppliers may discover and shall obtain a <br /> written interpretation or clarification from OWNER before proceeding with any Work affected thereby; provided, <br /> however, CONTRACTOR shall not be liable to the OWNER for failure to report any conflict, error or discrepancy <br /> unless CONTRACTOR or any of his Subcontractors or Suppliers had actual knowledge thereof or should <br /> 00800 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.