My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-212
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2015 2:13:22 PM
Creation date
10/1/2015 5:39:10 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
10/22/2013
Control Number
2013-212
Agenda Item Number
12.I.
Entity Name
NEC PBX of NEC Corporation Sole Source Provider
Subject
Telephone System Upgrade
Emergency Operations Center
Supplemental fields
SmeadsoftID
12443
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEC EIEC corporation of America <br /> of any specific personnel for this Project . NEC requires a minimum Project schedule <br /> extension of 30 days for any personnel change requests made by Client . <br /> 7 . 6 NEC will be relieved of a milestone commitment if Client's tasks or milestone dates for <br /> that milestone are not met . <br /> 7 . 7 If the scope of the Project expands beyond the Deliverables defined in this SOW , Client <br /> may be required to pay NEC additional fees and expenses incurred by NEC . <br /> The following are not covered under this SOW : <br /> 7 . 8 Support or replacement of any Equipment due to ( a ) Client' s unauthorized maintenance <br /> or repair of the Equipment , ( b) Client's unauthorized add , move , or changes to the <br /> Equipment , (c) unusual physical , electrical or electromagnetic stress (d ) Client <br /> negligence or abuse of the Equipment , including connection to inappropriate power <br /> supplies , (e) fire , flood , wind , lightning , or other similar acts of God , (f) failure of Client <br /> to <br /> maintain proper environmental conditions for the Equipment (g ) improper wiring , <br /> installation , repair, or alteration of the software or hardware by anyone other than NEC or <br /> its agents , ( h ) software changes or attempted changes in the Equipment by persons not <br /> authorized by NEC ( i ) database reprogramming required because of Client error of any <br /> kind Q ) failure of rotation media not furnished by NEC ( k) operation of the Equipment with <br /> other third party products not in accordance with the Equipment manufacturer's <br /> specifications ( 1 ) failures or other problems caused by products for which NEC is not <br /> otherwise contractually responsible or ( n ) Equipment failures due to causes other than <br /> ordinary use . <br /> 7 . 9 Any hardware upgrades , not specifically included in this SOW , but required to run new or <br /> updated Software . <br /> 8 . CHANGE MANAGEMENT PROCEDURES <br /> It may be necessary to amend this SOW for reasons including , but not limited to , the following : <br /> 8 . 1 Client's proposed changes to the scope of the Project or proposed changes to the <br /> INDIAN RIVER COUNTY (2013-28021 ) 14 of 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.