Laserfiche WebLink
k <br /> �. . _rL q- <br /> 4 . Disinfect and bacteriologically test all new potable water piping . <br /> B . Connection to existing lines to which piping of this Contract must connect : <br /> 1 . Expose buried lines to confirm or determine horizontal and vertical location of all <br /> underground piping, pipe diameter, end connection , and pipe material . <br /> 2 . Furnish and install all material , labor, and equipment including appropriate pipe, <br /> fittings , specials , and appurtenances to make proper connections . <br /> 3 . Coordinate with OWNER to schedule installation including nights and <br /> weekends , to limit operational outages . <br /> 4 . Supply temporary plugs and thrust restraint, if piping is not available . <br /> PART 2 — PRODUCTS (NOT USED) <br /> PART 3 — EXECUTION <br /> 3 . 01 GENERAL <br /> A . The CONTRACTOR shall coordinate construction and reconstruction work with the <br /> OWNER and ENGINEER. Unless otherwise indicated, the CONTRACTOR shall be <br /> responsible for the sequence of the work. All work shall be performed in accordance with <br /> applicable safety rules and regulations . <br /> B . The CONTRACTOR shall insure that any utilities connected to structures, equipment, <br /> and facilities to be removed, relocated, salvaged, replaced, or abandoned shall be <br /> rendered inoperable , replaced with new utilities , or adequately bypassed with temporary <br /> utilities before proceeding with reconstruction . <br /> C . The CONTRACTOR shall take precautions to avoid damage to adjacent facilities and to <br /> limit the reconstruction activities to the extent indicated. If reconstruction beyond the <br /> scope indicated is required , the CONTRACTOR shall obtain approval from the OWNER <br /> g prior to commencing work . <br /> 3 . 02 DISPOSAL <br /> A . Clearing and grubbing and removal of debris , where necessary , shall minimize <br /> interference with roads , streets, walks , and other adjacent occupied or used facilities <br /> which shall not be closed or obstructed without permission from the OWNER . Alternate <br /> routes shall be provided around closed or obstructed traffic ways . <br /> B . Site debris , rubbish , and other materials resulting from reconstruction operations shall be <br /> legally removed and disposed of at the CONTRACTOR ' s expense . Structures and <br /> equipment to be demolished shall be cleaned prior to demolition and the wash water <br /> properly disposed . No trace of these structures shall remain prior to placing of backfill in <br /> the areas from which structures were removed. <br /> C . Refuse , debris , and waste materials resulting from demolition and site clearing operations <br /> shall not be burned . All refuse and waste material shall be disposed of at the IRC. Landfill <br /> with the CONTRACTOR paying all transportation and disposal fees . <br /> END OF SECTION <br /> 01010 -3 <br />