Laserfiche WebLink
Raw <br /> G . Concrete Sidewalk and Driveway Replacement : Shall include sidewalk and/or <br /> driveway removed and replaced as a result of Contractor ' s operations . Minimum <br /> widths of replacement shall be as described in specifications or as shown on the <br /> plans . No separate payment will be made for concrete construction , including <br /> sawcutting, excavation , formwork, reinforcing, or other work or materials required in <br /> connection with concrete construction . The cost of all concrete sidewalk and <br /> driveway replacement shall be included in the cost of the pipe . <br /> H . Asphaltic Pavement Replacement : Shall include asphalt removed and replaced as a <br /> result of Contractor ' s operations . Minimum width of replacement shall be as <br /> described in the specifications or as shown on the plans . Work shall include <br /> sawcutting, disposal of demo ' d asphalt, and construction of the surface course , base, <br /> subgrade materials, and pavement markings , testing and all else incidental thereto . <br /> The cost of all asphaltic pavement replacement shall be included in the cost of the <br /> pipe . <br /> I . Asphalt Pavement Overlay : Shall include all re - surfacing as a result of construction <br /> operations . The work shall include tack coat, surface course and pavement markings . <br /> Asphalt pavement overlay shall be included in the cost of the pipe . <br /> J . Unimproved Driveway Replacement : Shall include (dirt, marl or shell ) driveway <br /> replacement/reconstruction removed and replaced as a result of the construction <br /> operations . Work shall include subgrade and surface (shell) materials , compaction , <br /> density testing, etc . Unimproved driveway replacement shall be computed using <br /> linear fee , as measured along the centerline of the pipe installed. <br /> K . Grassing : Measurement of grassing (seed or sod) shall be computed using the linear <br /> feet, as measured along the water main pipe, or grassed area disturbed and restored as <br /> a result of Contractor ' s operations . The entire width of the disturbed area shall be <br /> grassed . Payment shall include all necessary grading, soil preparation , seeding , <br /> sodding, fertilizer, mulch , and irrigation . <br /> L . Construction Stake- Out : Measurement of construction stake- out shall be computed <br /> as a lump sum item , for all required construction stake- out, including : layout and <br /> survey of the proposed construction, setting of stakes as required, necessary <br /> computations to establish the exact position of the work, establish reference to <br /> baselines, and provide and maintain off- set stakes outside the limits of construction <br /> and marked to show offset distance . <br /> M . Record Drawings/As- built Survey : Measurement of record drawings/as-built survey <br /> shall be computed as a lump sum item , for the preparation of " As - built Drawings " , <br /> including field survey , drawing preparation in "ACAD ", with ties to state plan <br /> coordinates , all in accordance with IRCUDS water and wastewater utility standards . <br /> The as-built drawings shall be provided certified by a licensed and registered land <br /> surveyor. <br /> • PAYMENT <br /> Payment will be made at the respective contract unit and/or lump sum price for each item <br /> shown in the Agreement, installed and accepted , which price and payment shall constitute <br /> full compensation for furnishing all materials and performing all work in connection <br /> therewith and incidental thereto . <br /> 01025 - 3 <br />