IL VLII <br /> i <br /> B . Pipe : Measurement of pipe shall be computed using linear feet, as measured along <br /> the centerline of the pipe installed ( Except when included in lump sum bid items -ie ; <br /> Aerial crossing) . No deduction will be made for the length of valves and fittings <br /> installed in the line . Where the measurement terminates at a valve, bend , tee, or other <br /> fitting, the centerline of the valve or fitting shall be the point of termination . All <br /> required erosion control clearing, excavation , backfill , compaction , all restoration and <br /> replacement, paving, grading, density testing , pipe lining, coating, encasement <br /> material , restraining devices , and all mechanical joint fittings and thrust blocks shall <br /> be included in the cost of the pipe . <br /> C . Fittings : Measurement of cast iron and ductile iron fittings shall be on the basis of <br /> weight. The weights used to determine the quantity installed shall be the weights of <br /> the appropriate fittings as listed in the supplier ' s invoice or catalog . When <br /> mechanical joint fittings are required, the weight of the gland bolts and gaskets shall <br /> not be added to the listed weight of the fittings . Where flanged fittings are furnished, <br /> the weight of the bolts and gaskets shall not be included . <br /> D . Gate Valves, air release valves , Tapping Sleeve and Valves and other miscellaneous <br /> appurtenances : Measurement shall be on the basis of furnishing and installing each <br /> type and size of appurtenance required, including valve boxes , covers , and other <br /> associated items . (Except when included in lump sum bid items — eg; aerial crossing, <br /> directional bore . ) <br /> E . Fire Hydrant Assembly : Measurement of fire hydrant assembly shall be for the <br /> actual number constructed in accordance with the Plans and Specifications , or as <br /> directed by the Engineer, at the unit price bid for the item " Fire Hydrant Assembly , " <br /> scheduled in the Form of Proposal . The unit price for "Fire Hydrant Assembly " shall <br /> include cutting bituminous paving, removal of paving courses and curb if required, <br /> excavation , furnishing and installation required length of 6" DIP water main , dry - <br /> barrel traffic hydrant, concrete foundations for hydrant, fitting, one ( 1 ) 6 " diameter <br /> gate valve , concrete thrust block (reaction backing) for fire hydrant , backfill , blue <br /> reflective markers, all materials , equipment, labor and all else necessary therefore <br /> and incidential thereto . <br /> F . HDPE Horizontal Directional Bore : Measurement of HDPE horizontal directional <br /> bore shall be computed using linear feet, as measured prior to pulling, and deducting <br /> the length of pipe above ground service and include all material ( including HDPE <br /> pipe), equipment, supplies , fuel , labor, sheeting and bracing, receiving and boring <br /> pits ( if required) , excavation , dewatering, backfilling , compaction , mechanical <br /> fittings , restoration , furnishing and in stallion of the HDPE pipe . Payments shall be <br /> based on a linear foot price for the directional bore length as measured as specified <br /> above . <br /> 01025 -2 <br />