Laserfiche WebLink
SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted in <br /> accordance with the Contract Documents . No separate payment will be made for <br /> excavation , trenching, dewatering, backfilling, leakage tests , surveying, density tests , <br /> or other incidental items of work not shown in the Agreement . <br /> 1 . 02 EQUIPMENT AND MATERIALS IN STORAGE <br /> Partial payment for materials and equipment in proper storage at the site of the work <br /> or other approved storage site will be made for those items for which the Contractor <br /> has submitted paid invoices to the Engineer. The partial payment for stored materials <br /> will be 50 % of the value of materials and equipment, based on receipted bills <br />, <br /> furnished but not incorporated in the work, as determined by Engineer. <br /> 1 . 03 MEASUREMENT <br /> A . Mobilization : Measurement shall be on a lump sum basis , and shall be limited to the <br /> following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ( $ ) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 1001000 31000 <br /> 1005000 500 , 000 159000 <br /> 5009000 110001000 3000 <br /> 1 , 000 , 000 2 , 0001000 609000 <br /> 27000 , 000 39000 , 000 901000 <br /> 35000 , 000 4005000 120, 000 <br /> 41000 , 000 51000, 000 1251000 <br /> 55000 , 000 6 , 0001000 1501000 <br /> 6 , 0001000 75000 , 000 1751000 <br /> 71000 , 000 10, 0005000 200 , 000 <br /> 1010001000 -- - - - - - - - - - - - 2501000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> pennissible amount for this item , as specified herein , the bid price will be reduced to <br /> the maximum permissible amount, and the reduced price will be used in correctly <br /> determining the total price for comparison of bids received . The cost of video taping <br /> the pre- construction condition shall be included in the lump- sum cost of <br /> mobilization . <br /> 01025 - 1 <br />