My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01025 <br /> MEASUREMENT AND PAYMENT <br /> PART 1 — GENERAL <br /> 1 . 01 GENERAL <br /> Measurement and payment will be based upon work completed and accepted in <br /> accordance with the Contract Documents . No separate payment will be made for <br /> excavation , trenching, dewatering, backfilling, leakage tests , surveying, density tests , <br /> or other incidental items of work not shown in the Agreement . <br /> 1 . 02 EQUIPMENT AND MATERIALS IN STORAGE <br /> Partial payment for materials and equipment in proper storage at the site of the work <br /> or other approved storage site will be made for those items for which the Contractor <br /> has submitted paid invoices to the Engineer. The partial payment for stored materials <br /> will be 50 % of the value of materials and equipment, based on receipted bills <br />, <br /> furnished but not incorporated in the work, as determined by Engineer. <br /> 1 . 03 MEASUREMENT <br /> A . Mobilization : Measurement shall be on a lump sum basis , and shall be limited to the <br /> following maximum amounts : <br /> ORIGINAL CONTRACT AMOUNT ( $ ) MAXIMUM AMOUNT OF <br /> FROM MORE THAN TO AND INCLUDING ITEM FOR MOBILIZATION <br /> 0 1001000 31000 <br /> 1005000 500 , 000 159000 <br /> 5009000 110001000 3000 <br /> 1 , 000 , 000 2 , 0001000 609000 <br /> 27000 , 000 39000 , 000 901000 <br /> 35000 , 000 4005000 120, 000 <br /> 41000 , 000 51000, 000 1251000 <br /> 55000 , 000 6 , 0001000 1501000 <br /> 6 , 0001000 75000 , 000 1751000 <br /> 71000 , 000 10, 0005000 200 , 000 <br /> 1010001000 -- - - - - - - - - - - - 2501000 <br /> Should the lump sum price bid for the item Mobilization exceed the maximum <br /> pennissible amount for this item , as specified herein , the bid price will be reduced to <br /> the maximum permissible amount, and the reduced price will be used in correctly <br /> determining the total price for comparison of bids received . The cost of video taping <br /> the pre- construction condition shall be included in the lump- sum cost of <br /> mobilization . <br /> 01025 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.