My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . Access for chemical delivery vehicles to all chemical storage and use areas on <br /> paved or compacted aggregate roadways . <br /> 7 . Parking areas for the OWNER ' S personnel . <br /> 8 . SCADA system including unobstructed access and electrical power to the <br /> operations control room . <br /> 3 . 02 SPECIFIC RESTRICTIONS ON SEQUENCE OF WORK <br /> A . Construction Sequence Restrictions : Because the Owner must maintain proper operation of <br /> the water treatment plant during execution of this contract, certain restrictions are necessary <br /> regarding the sequence of construction . The Owner will entertain proposed modifications to <br /> the restrictions enumerated below if the Contractor can provide reasonable assurance , to the <br /> Owner' s satisfaction , that the objective of maintaining proper operation of the water <br /> treatment plant can be achieved . <br /> 1 . Installation of the new electrical system and modifications to the existing electrical <br /> system shall be sequenced so as not to interfere with normal treatment plant operation in <br /> so far as possible . Specific sequencing limitations are as follows : <br /> a) Contractor shall plan and schedule in advance, with the Owner and Engineer, all <br /> power outages such as generator switchgear and transformer installation to <br /> minimize and combine power outages . <br /> b) Electrical work shall generally be performed in - step with the mechanical work . <br /> Install all grounding as structures are erected. Install inside lighting at the first <br /> opportunity . <br /> 2 . Tie- in work shall be planned well in advance such that all necessary materials and <br /> equipment are available . All shutdown of the treatment process shall be initiated by the <br /> Owner after the Contractor has demonstrated reasonable assurance that the available <br /> shutdown duration is sufficient . If required by the Owner, the Contractor shall provide a <br /> contingency plan should the available shutdown duration be exceeded . <br /> END OF SECTION <br /> 01014 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.