Laserfiche WebLink
If <br /> If I <br /> If '40 <br /> 1 . 05 NOTIFICATION REQUIREMENT <br /> A . Give a minimum of 7 calendar days advance notice, following approval of the shutdown <br /> plan , to the OWNER of each component proposed for shutdown or disruption , all of <br /> which shall be subject to OWNER ' s approval and limitations . <br /> 1 . 06 TIE- IN PREPARATIONS <br /> A . Where new systems are to be tied- into existing systems , which are required to be <br /> shutdown to make the tie- in , the new system shall be fully prepared in anticipation of the <br /> tie- in to minimize downtime of the existing system . The new equipment shall be fully <br /> tested to the maximum extent possible prior to the tie- in . Measurements shall be taken to <br /> ensure that the new equipment is of the correct size, length and alignment to complete the <br /> tie-in . The Contractor shall supply a list of all materials and equipment needed to <br /> accomplish the tie-in and shall review the proposed tie- in with the Owner . For each tie- in , <br /> the Contractor shall also provide a detailed schedule documenting each task necessary to <br /> complete the tie-in and the estimated time to complete the respective tasks . <br /> 1 . Once initiated, work shall continue until the tie-in is completed. Ensure that all <br /> materials , labor and equipment required to complete the work are available at the <br /> site of the tie- in prior to the initiation of work. <br /> 1 . 07 PLANT OPERATIONAL CONSTRAINTS , CONSTRUCTION SCHEDULING <br /> CONSTRAINTS AND SPECIAL CONDITIONS <br /> A . Existing Water Treatment Plant <br /> 1 . The existing water treatment plant inclusive of all unit processes must remain in <br /> service throughout the construction activities . <br /> 2 . Construction Scheduling Constraints : The new equipment shall be fully tested to <br /> the maximum extent possible prior to installation at the site . Measurements shall <br /> be taken to ensure that the new equipment is of the correct size, length and <br /> alignment as specified in the Bid documents . All new unit processes constructed <br /> under this contract shall be fully demonstrated to meet the stated performance <br /> criteria before they can be accepted for the beneficial occupancy . <br /> 3 . Special Conditions : None <br /> PART 2 - PRODUCTS (NOT USED) <br /> F <br /> PART 3 - EXECUTION ' <br /> 3 . 01 OPERATIONAL AND SCHEDULING CONSTRAINTS AND REQUIREMENTS , GENERAL <br /> REQUIREMENTS <br /> A . At all times , including plant shutdowns , the following must be in operation or available : <br /> 1 . Plant telephone and radio systems <br /> 2 . Electricity to the process and operations/control building . <br /> 3 . Existing standby/emergency generator facilities . <br /> 4 . Treatment plant potable and utility water and sewer systems . <br /> 5 . Access for OWNER, or its agent( s) , and delivery vehicles to all treatment plant <br /> facilities on paved or compacted aggregate roadways . <br /> 01014- 3 <br />