Laserfiche WebLink
1 . 13 HURRICANE PREPAREDNESS PLAN <br /> A . Within 30 days of the date of Notice to Proceed , submit a Hurricane Preparedness Plan to <br /> the Engineer and the Owner for approval . The Plan shall describe in detail the necessary <br /> measures which the Contractor will perform , at no additional costs to the Owner, in case <br /> of a hurricane warning . Revise Plan as required by the Engineer and Owner. <br /> 1 . 14 WEATHER PROTECTION <br /> A . In the event of inclement weather, the Contractor shall protect the Work and materials <br /> from damage or injury from the weather. If, in the opinion of the Owner, any portion of <br /> the Work or materials has been damaged by reason of failure on the part of the Contractor <br /> to so protect the Work, such Work and materials shall be removed and replaced with new <br /> materials and Work to the satisfaction of the Owner. <br /> 1 . 15 PROVISIONS FOR CONTROL OF EROSION <br /> A . Sufficient precautions shall be taken during construction to minimize the run- off of <br /> polluting substances such as silt, clay , fuels, oils , bitumens, calcium chloride , or other <br /> polluting materials harmful to humans , fish, or other life, into the supplies and surface <br /> waters of the State . Control measures must be adequate to assure that turbidity in the <br /> receiving water will not be increased more than 10 nephelometric turbidity units (NTU ) , <br /> or as otherwise required by the State or other controlling body , in water used for public <br /> water supply or fish unless limits have been established for the particular water. In <br /> surface water used for other purposes, the turbidity must not exceed 25 NTU unless <br /> otherwise permitted . Special precautions shall be taken in the use of construction <br /> equipment to prevent operations which promote erosion . <br /> 1 . 16 WARRANTIES <br /> A . Unless specified otherwise in the Contract Documents, all equipment supplied under <br /> these Specifications shall be warranted by the Contractor and the equipment <br /> Manufacturers for a minimum period of one ( 1 ) year. Warranty period shall commence <br /> on the date of Owner acceptance . <br /> Be The equipment shall be warranted to be free from defects in workmanship , design , and <br /> materials . If any part of the equipment should fail during the warranty period , it shall be <br /> replaced in the machine(s) and the unit( s) restored to service at no expense to the Owner. <br /> C . The Manufacturer' s warranty period shall run concurrently with the Contractor' s warranty <br /> or guarantee period . No exception to this provision shall be allowed . The Contractor shall <br /> be responsible for obtaining equipment warranties in accordance with Section 01740 <br /> from each of the respective suppliers or Manufacturers for all the equipment specified <br /> under Divisions 11 , 15 and 16 . <br /> D . In the event that the Manufacturer is unwilling to provide a one year warranty <br /> commencing at the time of Owner acceptance, the Contractor shall obtain from the <br /> Manufacturer a two (2 ) year warranty starting at the time of equipment delivery to the job <br /> site . This two-year warranty shall not relieve the Contractor of the one -year warranty <br /> starting at the time of Owner acceptance of the equipment. <br /> 011704 <br />