Laserfiche WebLink
1 . 17 CONNECTIONS TO EXISTING SYSTEMS <br /> A . The Contractor shall perform all work necessary to locate, excavate and prepare for <br /> connections to the existing water treatment plant system as shown on the Drawings or <br /> where directed by the Owner . The cost for this work and for the actual connection to the <br /> existing water treatment plant system shall be included in the bid for the project and shall <br /> not result in any additional cost to the Owner . <br /> Be It is the responsibility of the Contractor to expose as required, the existing pipes at the <br /> tie - in locations and, if necessary, any buried utilities in the immediate area of the tie- in <br /> that may affect the installation of new pipe as shown on the Drawings . Contractor is fully <br /> responsible for ordering any additional material , such as fittings and restrained pipe that <br /> may be needed to avoid existing buried utilities should such material not be shown on the <br /> Drawings or included in the Schedule of Prices . The Contractor may not schedule any <br /> tie- in activity until such additional material is on site and a specific detailed plan is <br /> approved by the Engineer in accordance with Section 01014 . <br /> 1 . 18 OBSTRUCTIONS <br /> A . The attention of the Contractor is drawn to the fact that during excavation at the Project <br /> site, the possibility exists of the Contractor encountering various water, chemical , <br /> electrical , or other lines not shown on the Drawings . The Contractor shall exercise <br /> extreme care before and during excavation to locate and flag these lines so as to avoid <br /> damage to the existing lines . Should damage occur to an existing line, the Contractor <br /> 40 shall repair the line at no cost to the Owner . <br /> Be It is the responsibility of the Contractor to ensure that all utility or other poles , the <br /> stability of which may be endangered by the close proximity of excavation , are <br /> temporarily stayed in position while work proceeds in the vicinity of the pole and that the <br /> utility or other companies concerned be given reasonable advance notice of any such <br /> excavation by the Contractor. <br /> 1 . 19 PROVISIONS FOR THE CONTROL OF DUST AND LITTER <br /> A . Sufficient precautions shall be taken during construction to minimize the amount of dust <br /> created . Wetting down the site may be required or as directed by the Owner to prevent <br /> dust as a result of vehicular traffic . Control of blowing litter caused by any regrading by <br /> the Contractor shall be the responsibility of the Contractor . <br /> 1 . 20 ON SITE STORAGE <br /> A . The Contractor' s attention is invited to special storage requirements and possible charges <br /> for noncompliance of on - site storage requirements for materials and equipment as <br /> specified in Section 01600 . <br /> 1 . 21 EMERGENCY PHONE NUMBERS AND ACCIDENT REPORTS <br /> A . Emergency phone numbers ( fire, medical , police, and Contractor ' s emergency after hours <br /> number) shall be posted at the Contractor' s phone and its locations be made to known to <br /> all . <br /> 01170 -, 5 <br />