My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INN NN, IN N4 <br /> I INN IN <br /> IN <br /> I IN IN <br /> IN IN IN 1 <br /> I IN 11-1 . ., k sa', $ "' . �r. ,{, S;a , -Yc- . ±f'�?.- R , : a I I x„^ r <br /> e. , ..w,'4 ,x- • , "my.. �w` ` i ` S „ rve '3ki . ,j <br /> i <br /> "+ B . Accidents shall be reported immediately to the Engineer by messenger or phone . <br /> C . All accidents shall be documented by the Contractor and a fully detailed written report <br /> submitted by the Contractor to the Engineer after each accident. <br /> 1 . 22 TRAFFIC CONTROL <br /> A . The Contractor shall ensure that vehicular flow is maintained in a safe manner and shall <br /> adhere to all State and Local requirements for maintenance of traffic , safety precautions, and <br /> lighting . Should the Owner request the preparation and submittal of a traffic maintenance <br /> and/or safety plan, the Contractor will do so, at no additional cost to the Owner, within 21 <br /> days of receipt of request. <br /> 1 . 23 WORK ADJACENT TO UTILITY FACILITIES <br /> A . The attention of the Contractor is drawn to existing overhead and underground utility <br /> facilities in the area of the Work. The Contractor shall protect all existing utility transmission <br /> and distribution facilities throughout the period of construction and shall notify the offices all <br /> utility companies at least 72 hours prior to the start of any construction . <br /> , <br /> B . It is the full and complete responsibility of the Contractor to determine the exact location of <br /> all overhead and underground utility transmission and distribution facilities in the area of the <br /> Work whether or not they are indicated on the Drawings . <br /> 1 . 24 SALVAGE <br /> A . Any existing equipment or material , including but not limited to , valves, pipes , fittings , <br /> couplings , etc . , which is removed or replaced as a result of construction under this project <br /> may be designated as salvage by the Engineer or Owner and if so shall be excavated, if <br /> necessary , and shall be cleaned and stored on or adjacent to the site in a protected place <br /> specified by the Owner or loaded into trucks provided by the Owner. Any equipment or <br /> material not worthy of salvaging, as directed by the Owner, shall be disposed of by the <br /> Contractor at a suitable location at the Contractor' s expense . <br /> 1 . 25 POTABLE WATER FOR TESTING AND CONSTRUCTION <br /> A . The Contractor shall be responsible for obtaining a temporary water meter from the <br /> Owner for the metering of the potable water used during testing and construction . The <br /> Owner shall provide this water at no cost to the Contractor, as long as the water is used at <br /> the project site exclusively . The Owner will perform daily tracking of water usage <br /> volumes . <br /> 1 . 26 DISINFECTION <br /> A . The Contractor shall clean , disinfect, and bacteriologically test and clear in accordance <br /> with Chapters 17 - 550 , 17 - 555 , and 17 - 560 of the Florida Administrative Code ( FAC ) and <br /> the local Health Department requirements , all water supply facilities affected by this <br /> project which shall come into contact with raw water, water being treated or treated water <br /> prior to placing the facility in operation . The above statement shall apply to both new <br /> facilities installed, and existing facilities which are to be impacted . <br /> 4 <br /> 01 170 -6 <br /> N .I INQ <br /> NNIN I <br /> IN <br /> IN <br /> IN <br /> I 1v I NN <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.