Laserfiche WebLink
INN NN, IN N4 <br /> I INN IN <br /> IN <br /> I IN IN <br /> IN IN IN 1 <br /> I IN 11-1 . ., k sa', $ "' . �r. ,{, S;a , -Yc- . ±f'�?.- R , : a I I x„^ r <br /> e. , ..w,'4 ,x- • , "my.. �w` ` i ` S „ rve '3ki . ,j <br /> i <br /> "+ B . Accidents shall be reported immediately to the Engineer by messenger or phone . <br /> C . All accidents shall be documented by the Contractor and a fully detailed written report <br /> submitted by the Contractor to the Engineer after each accident. <br /> 1 . 22 TRAFFIC CONTROL <br /> A . The Contractor shall ensure that vehicular flow is maintained in a safe manner and shall <br /> adhere to all State and Local requirements for maintenance of traffic , safety precautions, and <br /> lighting . Should the Owner request the preparation and submittal of a traffic maintenance <br /> and/or safety plan, the Contractor will do so, at no additional cost to the Owner, within 21 <br /> days of receipt of request. <br /> 1 . 23 WORK ADJACENT TO UTILITY FACILITIES <br /> A . The attention of the Contractor is drawn to existing overhead and underground utility <br /> facilities in the area of the Work. The Contractor shall protect all existing utility transmission <br /> and distribution facilities throughout the period of construction and shall notify the offices all <br /> utility companies at least 72 hours prior to the start of any construction . <br /> , <br /> B . It is the full and complete responsibility of the Contractor to determine the exact location of <br /> all overhead and underground utility transmission and distribution facilities in the area of the <br /> Work whether or not they are indicated on the Drawings . <br /> 1 . 24 SALVAGE <br /> A . Any existing equipment or material , including but not limited to , valves, pipes , fittings , <br /> couplings , etc . , which is removed or replaced as a result of construction under this project <br /> may be designated as salvage by the Engineer or Owner and if so shall be excavated, if <br /> necessary , and shall be cleaned and stored on or adjacent to the site in a protected place <br /> specified by the Owner or loaded into trucks provided by the Owner. Any equipment or <br /> material not worthy of salvaging, as directed by the Owner, shall be disposed of by the <br /> Contractor at a suitable location at the Contractor' s expense . <br /> 1 . 25 POTABLE WATER FOR TESTING AND CONSTRUCTION <br /> A . The Contractor shall be responsible for obtaining a temporary water meter from the <br /> Owner for the metering of the potable water used during testing and construction . The <br /> Owner shall provide this water at no cost to the Contractor, as long as the water is used at <br /> the project site exclusively . The Owner will perform daily tracking of water usage <br /> volumes . <br /> 1 . 26 DISINFECTION <br /> A . The Contractor shall clean , disinfect, and bacteriologically test and clear in accordance <br /> with Chapters 17 - 550 , 17 - 555 , and 17 - 560 of the Florida Administrative Code ( FAC ) and <br /> the local Health Department requirements , all water supply facilities affected by this <br /> project which shall come into contact with raw water, water being treated or treated water <br /> prior to placing the facility in operation . The above statement shall apply to both new <br /> facilities installed, and existing facilities which are to be impacted . <br /> 4 <br /> 01 170 -6 <br /> N .I INQ <br /> NNIN I <br /> IN <br /> IN <br /> IN <br /> I 1v I NN <br /> v <br />