My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77 <br /> In I <br /> 1 11 <br /> IIq4 <br /> a. ..1 11 , .. ' , Ilk <br /> Slj <br /> SECTION 01200 <br /> PROJECT MEETINGS <br /> PART 1 -- GENERAL <br /> 1 . 01 REQUIREMENTS INCLUDED <br /> A . The Contractor shall cooperate and coordinate with the Resident Project Representative <br /> to schedule and administer pre- construction meeting, periodic progress meetings and <br /> specially called meetings throughout progress of the work . <br /> 1 . Prepare agenda for meetings . <br /> 2 . Make physical arrangements for meetings . <br /> 3 . Preside at meetings . <br /> 4 . Record the minutes ; include significant proceedings and decisions . <br /> 5 . Reproduce and distribute copies of minutes within 15 working days after each <br /> meeting. <br /> a. To participants in the meeting . <br /> b . To Owner, Engineer, and other parties affected by decisions made at the <br /> meeting . <br /> B . Representatives of Contractors, Owner, Subcontractors and suppliers attending meetings <br /> shall be qualified and authorized to act on behalf of the entity each represents . <br /> C . Attend meetings to <br /> g ascertain that work Is expedited consistent with Contract Documents <br /> and construction schedules . <br /> 1002 RELATED REQUIREMENTS <br /> A . Instructions to Bidders are included in Division 0 . <br /> Be Construction Schedules are included in Section 01311 . <br /> C . Shop Drawings , Working Drawings and Samples are included in Section 01340 . <br /> D . Contract Closeout is included in Section 01700 . <br /> E . Operating and Maintenance Data is included in Section 01730 . <br /> 1 . 03 PRE- CONSTRUCTION MEETING <br /> A . Schedule a preconstruction meeting no later than 15 days after date of Notice to Proceed . <br /> Be Location : A central site, convenient for all parties , designated by the Owner. <br /> C . Attendance <br /> 1 . Owner' s Representative . <br /> 2 . Engineer and his/her professional consultants . <br /> 3 . Resident Project Representative . <br /> 01200 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.