My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Twl <br /> n4 I VI <br /> ij <br /> Inn <br /> In <br /> ..,' a.f1 16 ,x ,`L .} , 41 <br /> these Specifications . Training shall be provided on an 8 -ho <br /> ur per(less than eight ( 8 ) full working hours) shall not be credited toward a the <br /> specified al days <br /> durations . Training shall not be concurrent with on -going testing debugging or <br /> installation activities ; but shall be a separate activity devoted exclusively to the <br /> instruction of the Owner's personnel in the operation and maintenance of the <br /> Manufacturer' s equipment. Training shall be performed by qualified representatives of <br /> each equipment Manufacturer specifically skilled in providing instruction to operation <br /> personnel . Training shall provide an overview of operations and maintenance <br /> requirements and shall include but not be limited to : <br /> 1 • Description of unit and component parts, <br /> 2 . Operating capabilities and performance criteria, <br /> 3 . Operating procedures , <br /> 4 . Maintenance procedures , <br /> 5 . Servicing and lubrication schedules, <br /> 66 Troubleshooting, and <br /> 7 . Electrical instrumentation and control requirements and interface as a minimum . <br /> The operating and maintenance data to be provided in accordance with <br /> Specification Section 01730 shall be used as a basis for training. <br /> F . A certificate from the Manufacturer stating that the installation of the equipment is <br /> satisfactory, that the unit has been satisfactorily tested, is ready for operation, and that the <br /> operating personnel have been suitably instructed in the operation, lubrication , and care <br /> of the unit shall be submitted before start-up and acceptance by the Owner. The <br /> certificate shall indicate date and time instruction was given and names of operating <br /> personnel in attendance . This certification shall be submitted on the certification sheet <br /> 40 the form of which is at the end of this section . <br /> G . See the detailed Specifications for additional requirements for furnishing the services of <br /> the Manufacturer' s field service technician . <br /> In <br /> K For equipment furnished under Divisions other than 11 , 15 and 16 , the Contractor, unless <br /> otherwise specified, shall furnish the services of accredited field services technicians of <br /> the Manufacturer only when some evident malfunction or over-heating makes such <br /> services necessary in the opinion of the Engineer. <br /> 1 . 28 OPERATING AND MAINTENANCE DATA <br /> A . Operating and maintenance data covering all equipment furnished shall be delivered <br /> directly to the Orlando office of PBS &J, for approval within 60 days of shop drawing <br /> approval of each piece of equipment. No payment shall be made for equipment installed <br /> or stored on - site until the Engineer has approved the adequacy and completeness of the <br /> operating and maintenance data . Data shall be prepared and submitted in full <br /> conformance with Section 01730 . Final approved copies of operating and maintenance <br /> data shall have been delivered to the Engineer on Owner's behalf two weeks prior to <br /> scheduling the instruction period with the Owner. <br /> END OF SECTION <br /> 01 170- 8 <br /> 7777 <br /> 7r ll <br /> :4 <br /> -rIn 61 <br /> 6 n6 <br /> Inn <br /> ,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.