My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Itlee <br /> � <br /> It <br /> It <br /> WItIv <br /> Ilt,t ' <br /> rr <br /> .y <br /> re's r <br /> SECTION 01340 <br /> SUBMITTALS <br /> PART I - GENERAL <br /> 1 . 01 DESCRIPTION OF REQUIREMENTS <br /> A . This Section specifies the general methods and requirements of submissions applicable to <br /> Shop Drawings , Product Data, Samples, Construction Photographs, and Construction or <br /> Submittal Schedules . Additional general submission requirements are contained in <br /> Article 6 . 17 of the General Conditions . Detailed submittal requirements are specified in <br /> the technical Sections . <br /> B . All submittals shall be clearly identified by reference to Section Number, Paragraph , <br /> Drawing Number or Detail as applicable . Submittals shall be clear and legible and of <br /> sufficient size for presentation of data . <br /> C . The Contractor is to maintain an accurate updated submittal log and will bring this log to <br /> each scheduled progress meeting with the Owner ' s representatives . This log should <br /> include the following items : <br /> 1 . Submittal -Description and File number assigned. <br /> 2 . Date to Engineer. <br /> 3 . Date returned to Contractor from Engineer. <br /> 4 . Status of submittal (REVIEWED , NO COMMENTS ; REVIEWED <br /> COMMENTS AS NOTED ; REJECTED , REVISE AND RESUBMIT; or NOT <br /> REVIEWED) , <br /> 5 . Date of resubmittal and return ( as applicable) . <br /> 6 . Date material released for fabrication . <br /> 7 . Projected date of fabrication . <br /> 8 . Projected date of delivery to site . <br /> 9 . Status of O& M submittal . <br /> 1902 SHOP DRAWINGS , PRODUCT DATA, SAMPLES <br /> A . Shop Drawings <br /> 1 . Shop drawings as specified in individual Sections include, custom - prepared data <br /> such as fabrication and erection/installation (working) drawings, scheduled <br /> information , setting diagrams , actual shop work manufacturing instructions , <br /> custom templates, special wiring diagrams , coordination drawings, individual <br /> system or equipment inspection and test reports including performance curves <br /> and certifications , as applicable to the work. <br /> 2 . All shop drawings submitted by subcontractors shall be sent directly to the <br /> Contractor for checking . The Contractor shall be responsible for their submission <br /> at the proper time so as to prevent delays in delivery of materials . <br /> 3 . Check all subcontractors ' shop drawings regarding measurements, size of <br /> members , materials and details to make sure that they conform to the intent of the <br /> Drawings and related Sections . Return shop drawings found to be inaccurate or <br /> otherwise in error to the subcontractors for correction before submission thereof. <br /> 01340 - 1 <br /> It777x <br /> It <br /> It <br /> it <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.