Laserfiche WebLink
rr <br /> 1 7 In In <br /> ree 11 <br /> 'vc . r 'moi a a t tars F ; i <br /> Ann�.a , " ' ..s, ,. `t u ' m � .xt :N � . <br /> In <br /> Sly <br /> In <br /> shall furnish such justification and supporting evidence as the Engineer may deem <br /> necessary for determination as to whether the Contractor is entitled to an extension of <br /> time under the provisions of the contract . Engineer will , after receipt of such justification <br /> and supporting evidence make findings of fact and will advise the Contractor in writing <br /> In thereof. If the Engineer finds that the Contractor is entitled to any extension of any <br /> contract completion date under the provisions of this contract the Engineer ' s <br /> on I determination as to the total number of days of extension shall be based upon the <br /> currently approved schedule and on all data relevant to the extension . Such data shall be <br /> included in the next monthly updating of the schedule . The Contractor acknowledges and <br /> agrees that actual delays in activities which , according to the schedule, do not affect any <br /> contract completion date shown by the critical path in the schedule do not have any affect <br /> on the contract completion date or dates, and therefore, wno <br /> ill not be the basis for a change <br /> therein . <br /> Fe From time to time it may be necessary for the contract schedule and/or completion time <br /> to be adjusted by the Engineer to reflect the effects of job conditions , weather, technical <br /> difficulties , strikes, unavoidable delays on the part of the Owner or his representatives, <br /> 41 and other unforeseeable conditions which may indicate schedule adjustments and/or <br /> completion time extension . Under such conditions, the Contractor shall reschedule the <br /> work and/or contract completion time to reflect the changed conditions and the <br /> Contractor shall revise his schedule accordingly . No additional compensation shall be <br /> made to the Contractor for such schedule changes except for unavoidable overall contract <br /> time extensions beyond the actual completion of all unaffected work in the contract, in <br /> which case the Contractor shall take all possible action to minimize any time extension <br /> and any additional cost to the Owner, <br /> It is specifically pointed out that the use of <br /> available float time in the schedule may be used by the Owner as defined by the <br /> Engineer, as well as by the Contractor. Float time is defined as the amount of time <br /> between the early start date, and the late start date, or the early finish date and the late <br /> finish date, of any of the activities in the schedule , <br /> G . The Owner controls the float time in the approved schedule and , therefore, without <br /> obligation to extend either the overall completion date or any intermediate completion <br /> dates set out in the schedule, the Owner may initiate changes to the contract work that <br /> absorb float time only . Owner- initiated changes that affect the critical path on the <br /> approved schedule shall be the sole grounds for extending (or contracting) said <br /> completion dates . Contractor- initiated changes that encroach on the float time identified <br /> in the approved schedule may be accomplished with the Owner ' s concurrence , Such <br /> changes , however, shall give way to Owner- initiated changes competing for the same <br /> float time . <br /> 3 . 03 COORDINATING SCHEDULES WITH OTHER CONTRACT SCHEDULES <br /> A • Where work is to be performed under this contract concurrently with and/or contingent <br /> upon work performed on the same facilities or area under other contracts, the <br /> Contractor ' s schedule shall be coordinated with the schedules of the other contracts . The <br /> Contractor shall obtain the schedules of the other appropriate contracts from the Engineer <br /> and/or Owner for the preparation and updating of his schedule and shall make the <br /> required changes in his schedule when indicated by changes in corresponding schedules , <br /> In <br /> END OF SECTION <br /> 01311 - 4 <br /> %nAT In <br /> In <br /> In <br /> 777777: 7777 ,77P, 7, 11 1 In , o <br /> In I I nn In <br /> n Ann ' <br /> In <br /> an <br /> Tn <br /> InsIn <br /> l• <br /> . . ,•7r , . ,, .., . . a . ,. a- . , a , . , _ .. - . . , . . . <br /> r. ,.. . , .. _ <br />