My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr <br /> 1 7 In In <br /> ree 11 <br /> 'vc . r 'moi a a t tars F ; i <br /> Ann�.a , " ' ..s, ,. `t u ' m � .xt :N � . <br /> In <br /> Sly <br /> In <br /> shall furnish such justification and supporting evidence as the Engineer may deem <br /> necessary for determination as to whether the Contractor is entitled to an extension of <br /> time under the provisions of the contract . Engineer will , after receipt of such justification <br /> and supporting evidence make findings of fact and will advise the Contractor in writing <br /> In thereof. If the Engineer finds that the Contractor is entitled to any extension of any <br /> contract completion date under the provisions of this contract the Engineer ' s <br /> on I determination as to the total number of days of extension shall be based upon the <br /> currently approved schedule and on all data relevant to the extension . Such data shall be <br /> included in the next monthly updating of the schedule . The Contractor acknowledges and <br /> agrees that actual delays in activities which , according to the schedule, do not affect any <br /> contract completion date shown by the critical path in the schedule do not have any affect <br /> on the contract completion date or dates, and therefore, wno <br /> ill not be the basis for a change <br /> therein . <br /> Fe From time to time it may be necessary for the contract schedule and/or completion time <br /> to be adjusted by the Engineer to reflect the effects of job conditions , weather, technical <br /> difficulties , strikes, unavoidable delays on the part of the Owner or his representatives, <br /> 41 and other unforeseeable conditions which may indicate schedule adjustments and/or <br /> completion time extension . Under such conditions, the Contractor shall reschedule the <br /> work and/or contract completion time to reflect the changed conditions and the <br /> Contractor shall revise his schedule accordingly . No additional compensation shall be <br /> made to the Contractor for such schedule changes except for unavoidable overall contract <br /> time extensions beyond the actual completion of all unaffected work in the contract, in <br /> which case the Contractor shall take all possible action to minimize any time extension <br /> and any additional cost to the Owner, <br /> It is specifically pointed out that the use of <br /> available float time in the schedule may be used by the Owner as defined by the <br /> Engineer, as well as by the Contractor. Float time is defined as the amount of time <br /> between the early start date, and the late start date, or the early finish date and the late <br /> finish date, of any of the activities in the schedule , <br /> G . The Owner controls the float time in the approved schedule and , therefore, without <br /> obligation to extend either the overall completion date or any intermediate completion <br /> dates set out in the schedule, the Owner may initiate changes to the contract work that <br /> absorb float time only . Owner- initiated changes that affect the critical path on the <br /> approved schedule shall be the sole grounds for extending (or contracting) said <br /> completion dates . Contractor- initiated changes that encroach on the float time identified <br /> in the approved schedule may be accomplished with the Owner ' s concurrence , Such <br /> changes , however, shall give way to Owner- initiated changes competing for the same <br /> float time . <br /> 3 . 03 COORDINATING SCHEDULES WITH OTHER CONTRACT SCHEDULES <br /> A • Where work is to be performed under this contract concurrently with and/or contingent <br /> upon work performed on the same facilities or area under other contracts, the <br /> Contractor ' s schedule shall be coordinated with the schedules of the other contracts . The <br /> Contractor shall obtain the schedules of the other appropriate contracts from the Engineer <br /> and/or Owner for the preparation and updating of his schedule and shall make the <br /> required changes in his schedule when indicated by changes in corresponding schedules , <br /> In <br /> END OF SECTION <br /> 01311 - 4 <br /> %nAT In <br /> In <br /> In <br /> 777777: 7777 ,77P, 7, 11 1 In , o <br /> In I I nn In <br /> n Ann ' <br /> In <br /> an <br /> Tn <br /> InsIn <br /> l• <br /> . . ,•7r , . ,, .., . . a . ,. a- . , a , . , _ .. - . . , . . . <br /> r. ,.. . , .. _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.