Laserfiche WebLink
"IP, IF �. . <br /> I PIn , <br /> .. <br /> v .'. k � .. IF <br /> IF FIX %FF <br /> IF e <br /> 2 . 04 TEMPORARY WATER CONTROL <br /> A . The flow of water through the construction site shall be controlled by the Contractor such <br /> that it does not damage any constructed items ; however, it shall be diverted and <br /> IF channeled to effectively leave the site as soon as possible . Puddling and ponding on the <br /> site is not permitted . <br /> B . Water shall be controlled such that it does not enter excavated areas, nor is deposited on <br /> or against constructed features . <br /> 2 . 05 TEMPORARY DEBRIS CONTROL <br /> A . Provision shall be made by each Contractor to have available adequate containers to hold <br /> any and all debris that is to be generated from the project . Containers should be covered <br /> to prevent wind blowing paper, plastic, and lightweight products around and off the site . <br /> B . Instructions shall be given to personnel to utilize the trash containers . Containers shall be <br /> placed in convenient places at the site . <br /> C . At least once per week, a thorough cleaning of trash and debris shall be made at the <br /> construction site . An acceptable method of disposal shall be employed . <br /> END OF SECTION <br /> 01560- 2 <br />