My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
el <br /> ev <br /> —5 Al I <br /> WV <br /> - "'t —d a:, Y § ' CY,�' Wee . $ < § a3 .f. i <br /> e Ile <br /> C . Cement and lime shall be stored under a roof and off the ground and shall be kept <br /> completely dry at all times . All structural , miscellaneous and reinforcing steel shall be <br /> stored off the ground or otherwise to prevent accumulations of dirt or grease and in a <br /> position to prevent accumulations of standing water and to minimize rusting . Beams shall <br /> be stored with the webs vertical . Precast concrete shall be handled and stored in a manner <br /> to prevent accumulations of dirt, standing water, staining, chipping or cracking . Brick, <br /> block and similar masonry products shall be handled and stored in a manner to reduce <br /> breakage, cracking and spalling to a minimum . <br /> D . All mechanical and electrical equipment and instruments subject to corrosive damage by <br /> the atmosphere if stored outdoors (even though covered by canvas) shall be stored in a <br /> weathertight building to prevent injury . The building may be a temporary structure on the <br /> site or elsewhere, but it must be satisfactory to the Resident Project Representative . <br /> Building shall be provided with adequate ventilation to prevent condensation . Maintain <br /> temperature and humidity within range required by manufacturer. <br /> 1 . All equipment shall be stored fully lubricated with oil , grease and other <br /> lubricants unless otherwise instructed by the manufacturer . <br /> 2 . Moving parts shall be rotated a minimum of once weekly to ensure proper <br /> lubrication and to avoid metal -to-metal " welding " . Upon installation of the <br /> equipment, the Contractor shall start the equipment, at least half load, once <br /> weekly for an adequate period of time to ensure that the equipment does not <br /> deteriorate from lack of use . <br /> 3 . Lubricants shall be changed upon completion of installation and as frequently as <br /> required thereafter during the period between installation and acceptance . New <br /> lubricants shall be put into the equipment at the time of acceptance . <br /> 4 . Prior to acceptance of the equipment, the Contractor shall have the manufacturer : <br /> inspect the equipment and certify that its condition has not been detrimentally 1 <br /> affected by the long storage period. Such certifications by the manufacturer shall ' <br /> be deemed to mean that the equipment is judged by the manufacturer to be in a <br /> condition equal to that of equipment that has been shipped, installed, tested and <br /> accepted in a minimum time period. As such , the manufacturer will guaranty the <br /> equipment equally in both instances . If such a certification is not given , the <br /> equipment shall be judged to be defective . It shall be removed and replaced at the t <br /> Contractor' s expense . <br /> END OF SECTION <br /> li <br /> • <br /> 01600 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.