Laserfiche WebLink
SECTION 0 16 10 <br /> MATERIAL AND EQUIPMENT <br /> PART 1 — GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . Material and equipment incorporated into the work : <br /> 1 . Conform to applicable specifications and standards . <br /> 2 . Comply with size , make, type and quality specified, or as specifically approved <br /> in writing by the Engineer. <br /> 3 . Manufactured and Fabricated Products <br /> a . Design , fabricate and assemble in accord with the best Engineering and <br /> shop practices . <br /> b . Manufacture like parts of duplicate units to standard sizes and gauges, to <br /> be interchangeable . <br /> C * Two or more items of the same kind shall be identical , by the same <br /> manufacturer. <br /> d . Products shall be suitable for service conditions . <br /> e . Equipment capacities, sizes and dimensions shown or specified shall be <br /> adhered to unless variations are specifically approved in writing . <br /> 4 . Do not use material or equipment for any purpose other than that for which it is <br /> designed or is specified . <br /> 1 . 02 RELATED WORK <br /> A . Conditions of the Contract <br /> Be Summary of Work is included in Section 0 10 10 . <br /> C . Special Provisions is included in Section 01170 . <br /> D . Submittals are included in Section 01340 . <br /> E . Substitutions and Product Options are included in Section 01630 . <br /> F . Cleaning is included in Section 01710 . <br /> G . Operating and Maintenance Data is included in Section 01730 . <br /> H . Warranties and Bonds are included in Section 01740 . <br /> 1 . 03 APPROVAL OF MATERIALS <br /> a , <br /> A . Only new materials and equipment shall be incorporated in the work. All materials and <br /> equipment furnished shall be subject to the inspection and approval of the Resident <br /> Project Representative . No material shall be delivered to the work without prior approval <br /> of the Resident Project Representative . <br /> 01610- 1 <br />