Laserfiche WebLink
01C 11 0 - { ., .t .. . 0 <br /> Be Within 30 days after the effective date of the Agreement, submit to the Resident Project <br /> Representative, data relating to materials and equipment proposed to be furnished for the <br /> work. Such data shall be in sufficient detail to enable the Resident Project Representative <br /> or Engineer to identify the particular product and to form an opinion as to its conformity <br /> to the specifications . The data shall comply with Section 01340 . <br /> C . Facilities and labor for handling and inspection of all materials and equipment shall be <br /> furnished by the Contractor . If the Resident Project Representative or Engineer requires , <br /> either prior to beginning or during the progress of the work, submit samples of materials <br /> for such special tests as may be necessary to demonstrate that they conform to the <br /> specifications . Such samples shall be furnished , stored , packed, and shipped as directed at <br /> the Contractor' s expense . Except as otherwise noted, the Owner will make arrangements <br /> for and pay for the tests . <br /> D . Submit data and samples sufficiently early to permit consideration and approval before <br /> materials are necessary for incorporation in the work . Any delay of approval resulting <br /> from the failure to submit samples or data promptly shall not be used as a basis of claim <br /> against the Owner or the Engineer. <br /> IL <br /> E . In order to demonstrate the proficiency of workmen or to facilitate the choice among <br /> several textures , types, finishes and surfaces, provide such samples of workmanship or <br /> finish as may be required . <br /> F . The materials and equipment used on the work shall correspond to the approved samples <br /> or other data . <br /> 1 . 04 MANUFACTURER' S INSTRUCTIONS FOR INSTALLATION <br /> A . When Contract Documents require that installation of work shall comply with <br /> manufacturer' s printed instructions , obtain and distribute copies of such instructions to <br /> parties involved in the installation , including five copies to the Resident Project <br /> Representative , <br /> 1 . Maintain one set of complete instructions at the job site during installation and <br /> until completion . <br /> Be Handle, install , connect, clean , condition and adjust products in strict accord with such <br /> instructions and in conformity with specified requirements . <br /> 1 . Should job conditions or specified requirements conflict with manufacturer' s <br /> instructions , consult with Resident Project Representative for further instructions . <br /> 2 . Do not proceed with work without clear instructions . <br /> C . Perform work in accordance with manufacturer' s instructions . Do not omit any <br /> preparatory step or installation procedure unless specifically modified or exempted by <br /> Contract Documents . <br /> 1 . 05 TRANSPORTATION AND HANDLING <br /> A . Arrange deliveries of products in accord with construction schedules , coordinate to avoid <br /> conflict with work and conditions at the site . <br /> 1 . Deliver products in undamaged condition , in manufacturer' s original containers <br /> or packaging, with identifying labels intact and legible . <br /> 01610-2 <br />