Laserfiche WebLink
FFF <br /> ., ,,� , 3$5 '€,� . �."r # ` k asps .„i . „�a - s ;5,., x, > , ' ' a a �s <br /> � <br /> 7. , ” r: + x ' " y a <br /> IF <br /> • 5 . Moving parts shall be rotated a minimum of once weekly to insure proper <br /> lubrication and to avoid metal -to- metal " welding " . Upon installation of the <br /> equipment, start the equipment, at least half load, once weekly for an adequate <br /> period of time to ensure that the equipment does not deteriorate from lack of use . <br /> 6 . Lubricants shall be changed upon completion of installation and as frequently as <br /> required thereafter during the period between installation and acceptance . <br /> Mechanical equipment to be used in the work, if stored for longer than ninety <br /> days , shall have the bearings cleaned, flushed and lubricated prior to testing and <br /> startup, at no additional cost to the Owner . <br /> 7 . Prior to acceptance of the equipment, have the manufacturer inspect the <br /> equipment and certify that its condition has not been detrimentally affected by <br /> the long storage period. Such certifications by the manufacturer shall be deemed <br /> to mean that the equipment is judged by the manufacturer to be in a condition <br /> equal to that of equipment that has been shipped, installed, tested and accepted in <br /> a minimum time period . As such , the manufacturer will guarantee the equipment <br /> equally in both instances . If such a certification is not given, the equipment shall <br /> be judged to be defective . It shall be removed and replaced at the Contractor' s <br /> expense . <br /> 1 . 09 WARRANTY <br /> A . For all major pieces of equipment, submit a warranty from the equipment manufacturer <br /> as specified in Section 01740 . <br /> 1 . 10 SPARE PARTS <br /> A . Spare parts for certain equipment provided under Divisions 11 , 15 and 16 have been <br /> specified in the pertinent Sections . Collect and store all spare parts as required by the <br /> manufacturer in accordance with Paragraph 1 . 08 above . In addition , furnish to the <br /> Engineer an inventory listing all spare parts, the equipment they are associated with , the <br /> name and address of the supplier and the delivered cost of each item . Copies of actual <br /> invoices for each item shall be furnished with the inventory to substantiate the delivered <br /> cost . Deliver the spare parts to the Owner not later than 10 days prior to plant start-up . <br /> 1 . 11 GREASE , OIL AND FUEL <br /> A . Allgrease, oil and fuel required for testing of equipment shall be furnished with the i <br /> respective equipment . The Owner shall be furnished with a year' s supply of required <br /> lubricants including grease and oil of the type recommended by the manufacturer with <br /> each item of equipment supplied under Divisions 11 , 15 and 16 . <br /> B . The Contractor shall be responsible for changing the oil in all drives and intermediate It <br /> drives of each mechanical equipment after initial break- in of the equipment, which in no <br /> event shall be any longer than three weeks of operation . <br /> PART 2 — PRODUCTS (NOT USED) <br /> PART 3 — EXECUTION (NOT USED) <br /> • <br /> END OF SECTION <br /> 01610 - 5 <br />