My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FFF <br /> ., ,,� , 3$5 '€,� . �."r # ` k asps .„i . „�a - s ;5,., x, > , ' ' a a �s <br /> � <br /> 7. , ” r: + x ' " y a <br /> IF <br /> • 5 . Moving parts shall be rotated a minimum of once weekly to insure proper <br /> lubrication and to avoid metal -to- metal " welding " . Upon installation of the <br /> equipment, start the equipment, at least half load, once weekly for an adequate <br /> period of time to ensure that the equipment does not deteriorate from lack of use . <br /> 6 . Lubricants shall be changed upon completion of installation and as frequently as <br /> required thereafter during the period between installation and acceptance . <br /> Mechanical equipment to be used in the work, if stored for longer than ninety <br /> days , shall have the bearings cleaned, flushed and lubricated prior to testing and <br /> startup, at no additional cost to the Owner . <br /> 7 . Prior to acceptance of the equipment, have the manufacturer inspect the <br /> equipment and certify that its condition has not been detrimentally affected by <br /> the long storage period. Such certifications by the manufacturer shall be deemed <br /> to mean that the equipment is judged by the manufacturer to be in a condition <br /> equal to that of equipment that has been shipped, installed, tested and accepted in <br /> a minimum time period . As such , the manufacturer will guarantee the equipment <br /> equally in both instances . If such a certification is not given, the equipment shall <br /> be judged to be defective . It shall be removed and replaced at the Contractor' s <br /> expense . <br /> 1 . 09 WARRANTY <br /> A . For all major pieces of equipment, submit a warranty from the equipment manufacturer <br /> as specified in Section 01740 . <br /> 1 . 10 SPARE PARTS <br /> A . Spare parts for certain equipment provided under Divisions 11 , 15 and 16 have been <br /> specified in the pertinent Sections . Collect and store all spare parts as required by the <br /> manufacturer in accordance with Paragraph 1 . 08 above . In addition , furnish to the <br /> Engineer an inventory listing all spare parts, the equipment they are associated with , the <br /> name and address of the supplier and the delivered cost of each item . Copies of actual <br /> invoices for each item shall be furnished with the inventory to substantiate the delivered <br /> cost . Deliver the spare parts to the Owner not later than 10 days prior to plant start-up . <br /> 1 . 11 GREASE , OIL AND FUEL <br /> A . Allgrease, oil and fuel required for testing of equipment shall be furnished with the i <br /> respective equipment . The Owner shall be furnished with a year' s supply of required <br /> lubricants including grease and oil of the type recommended by the manufacturer with <br /> each item of equipment supplied under Divisions 11 , 15 and 16 . <br /> B . The Contractor shall be responsible for changing the oil in all drives and intermediate It <br /> drives of each mechanical equipment after initial break- in of the equipment, which in no <br /> event shall be any longer than three weeks of operation . <br /> PART 2 — PRODUCTS (NOT USED) <br /> PART 3 — EXECUTION (NOT USED) <br /> • <br /> END OF SECTION <br /> 01610 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.