My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-111
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:30:25 PM
Creation date
10/1/2015 2:47:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/04/2010
Control Number
2010-111
Agenda Item Number
12.J.1.
Entity Name
Timothy Rose
Subject
North Water Treatment and Raw Water Transmission System
Project Number
2422
Bid Number
2010024
Supplemental fields
SmeadsoftID
10136
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
€ - 3 ro : t a t s. . e "At e . yvi <br /> a- I A1i <br /> DEMONSTRATION TEST PROCEDURES ( SAMPLE) <br /> PROJECT DATA CONTRACT DATA <br /> NAME : North and South WTP <br /> Remote Supply Wells <br /> NUMBER : <br /> LOCATION : Vero Beach DATE : <br /> OWNER : _Indian River County, Florida <br /> OTHER : <br /> TEST AREA : INTERNAL RECYCLE PUMPS SHEET : 1 OF 2 <br /> DATE VERIFIED <br /> TEST DESCRIPTION : VERIFIED BY <br /> 1 . Pump Capacity Verification <br /> A . Shutoff Head - Record pressure of each pump under dead <br /> head conditions (pump against closed valve) . <br /> Pump 1 psig (actual ) psig (expected) <br /> Pump 2 psig ( actual ) psig (expected) <br /> B . Operation test for each pump with valve open . Take discharge and suction pressure <br /> readings while reading flow meter (flow meter will be assumed to be accurate) after ten <br /> minute runs at steady pressure after flow has been fully establish . <br /> Pump 1 gpm (from meter) TDH <br /> gpm (from cert . curve @ above pressure) <br /> Pump 2 gpm (from meter) TDH <br /> gpm (from cert . curve @ above pressure) <br /> f <br /> C . Pump check valve operation observed <br /> E <br /> A <br /> i <br /> 01650- 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.