Laserfiche WebLink
€ - 3 ro : t a t s. . e "At e . yvi <br /> a- I A1i <br /> DEMONSTRATION TEST PROCEDURES ( SAMPLE) <br /> PROJECT DATA CONTRACT DATA <br /> NAME : North and South WTP <br /> Remote Supply Wells <br /> NUMBER : <br /> LOCATION : Vero Beach DATE : <br /> OWNER : _Indian River County, Florida <br /> OTHER : <br /> TEST AREA : INTERNAL RECYCLE PUMPS SHEET : 1 OF 2 <br /> DATE VERIFIED <br /> TEST DESCRIPTION : VERIFIED BY <br /> 1 . Pump Capacity Verification <br /> A . Shutoff Head - Record pressure of each pump under dead <br /> head conditions (pump against closed valve) . <br /> Pump 1 psig (actual ) psig (expected) <br /> Pump 2 psig ( actual ) psig (expected) <br /> B . Operation test for each pump with valve open . Take discharge and suction pressure <br /> readings while reading flow meter (flow meter will be assumed to be accurate) after ten <br /> minute runs at steady pressure after flow has been fully establish . <br /> Pump 1 gpm (from meter) TDH <br /> gpm (from cert . curve @ above pressure) <br /> Pump 2 gpm (from meter) TDH <br /> gpm (from cert . curve @ above pressure) <br /> f <br /> C . Pump check valve operation observed <br /> E <br /> A <br /> i <br /> 01650- 5 <br />