B . The OWNER shall have the option of direct purchase of all material and equipment for the <br /> project in accordance with Rule 12A- 1 - 094 of the Florida Administrative Code . The <br /> contractor will be responsible for preparing the purchase documents for purchasing by the <br /> owner. The contractor will be responsible for scheduling , receiving , handling , and storage <br /> of all direct purchase material and equipment . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Masteller & Moler , Inc . , hereinafter called ENGINEER , and who <br /> is to act as OWNER' S representative , assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> ( a ) Within 15 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to <br /> be utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions <br /> prior to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor , equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating <br /> construction . <br /> ( b ) From 16 calendar days to 120 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipe and appurtenant items . <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to their pre - construction condition . <br /> 4 . Correct all deficiencies noted by Engineer . <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a ) and b ) constitutes <br /> Substantial Completion . <br /> ( c ) From 121 calendar days to 150 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures . <br /> 3 . 2 Completion of all tasks outlined above ( i . e . , Subparagraphs a , b , and c ) constitute <br /> Final <br /> Completion . <br /> 00530 -2 <br /> C : \Documents and Settings\mmclaughlin\Local Setting s\Te m pora ry Internet Files\Content. Outlook\24026LX8\00530 Agreement A1A <br /> Reuse . doc <br />