My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-005
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 1:50:29 PM
Creation date
10/1/2015 1:32:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/11/2011
Control Number
2011-005
Agenda Item Number
12.J.1
Entity Name
Timothy Rose Construction,Inc.
Subject
Barrier Island Reuse Water System Improvements
SR510 Reuse Water Systerm Improvements
Area
SR 510,77th St.
Supplemental fields
SmeadsoftID
9203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . The OWNER shall have the option of direct purchase of all material and equipment for the <br /> project in accordance with Rule 12A- 1 - 094 of the Florida Administrative Code . The <br /> contractor will be responsible for preparing the purchase documents for purchasing by the <br /> owner. The contractor will be responsible for scheduling , receiving , handling , and storage <br /> of all direct purchase material and equipment . <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Masteller & Moler , Inc . , hereinafter called ENGINEER , and who <br /> is to act as OWNER' S representative , assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents . <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> ( a ) Within 15 calendar days from effective date of Notice to Proceed , Contractor shall <br /> complete the following tasks : <br /> 1 . Obtain all necessary permits . <br /> 2 . Receive approved shop drawings for all materials and equipment to <br /> be utilized in the job . <br /> 3 . Perform all photographic recording and documentation of conditions <br /> prior to construction . <br /> 4 . Locate all existing utilities in the area of work . <br /> 5 . Submit and secure approval of shop drawings . <br /> 6 . Mobilize all labor , equipment , and materials . <br /> 7 . Deliver and store all equipment and materials to the job site . <br /> 8 . Notify all utilities and other affected parties prior to initiating <br /> construction . <br /> ( b ) From 16 calendar days to 120 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Install all pipe and appurtenant items . <br /> 2 . Perform all testing . <br /> 3 . Restore all disturbed areas to their pre - construction condition . <br /> 4 . Correct all deficiencies noted by Engineer . <br /> Completion of all tasks outlined above ( i . e . , Subparagraphs a ) and b ) constitutes <br /> Substantial Completion . <br /> ( c ) From 121 calendar days to 150 calendar days from the effective date of Notice to <br /> Proceed , the CONTRACTOR shall complete the following tasks : <br /> 1 . Clean up project area . <br /> 2 . Remove all equipment and material from project site . <br /> 3 . Perform contract closeout procedures . <br /> 3 . 2 Completion of all tasks outlined above ( i . e . , Subparagraphs a , b , and c ) constitute <br /> Final <br /> Completion . <br /> 00530 -2 <br /> C : \Documents and Settings\mmclaughlin\Local Setting s\Te m pora ry Internet Files\Content. Outlook\24026LX8\00530 Agreement A1A <br /> Reuse . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.