My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-025
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:40:33 PM
Creation date
10/1/2015 1:39:12 AM
Metadata
Fields
Template:
Official Documents
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H . correlate the information known to Bidder, information and observations obtained from <br /> visits to the Site , reports and drawings identified in the Bidding Documents , and all additional <br /> examinations , investigations , explorations , tests , studies , and data with the Bidding Documents ; <br /> I . promptly give ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that Bidder discovers in the Bidding Documents and confirm that the written <br /> resolution thereof by ENGINEER is acceptable to Bidder; and <br /> J . determine that the Bidding Documents are generally sufficient to indicate and convey <br /> understanding of all terms and conditions for the performance of the Work . <br /> 4 . 08 The submission of a Bid will constitute an incontrovertible representation by Bidder that <br /> Bidder has complied with every requirement of this Article 4 , that without exception the Bid is <br /> premised upon performing and furnishing the Work required by the Bidding Documents and <br /> applying any specific means , methods , techniques , sequences , and procedures of construction <br /> that may be shown or indicated or expressly required by the Bidding Documents , that Bidder has <br /> given ENGINEER written notice of all conflicts , errors , ambiguities , and discrepancies that Bidder <br /> has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are <br /> acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and <br /> convey understanding of all terms and conditions for performing and furnishing the Work . <br /> ARTICLE 5 - PRE- BID CONFERENCE <br /> 5 . 01 The date , time , and location for a MANDATORY Pre- Bid conference , is specified in the <br /> Advertisement for Bids . Representatives of OWNER and ENGINEER will be present to discuss <br /> the Project . Bidders are required to attend and participate in the conference . ENGINEER will <br /> transmit to all prospective Bidders of record such Addenda as ENGINEER considers necessary in <br /> response to questions arising at the conference . Oral statements may not be relied upon and will <br /> not be binding or legally effective . <br /> ARTICLE 6 - SITE AND OTHER AREAS <br /> 6 . 01 The Site is identified in the Bidding Documents . All additional lands and access thereto <br /> required for temporary construction facilities , construction equipment, or storage of materials and <br /> equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR . <br /> Easements for permanent structures or permanent changes in existing facilities are to be obtained <br /> and paid for by OWNER unless otherwise provided in the Bidding Documents . <br /> ARTICLE 7 - INTERPRETATIONS AND ADDENDA <br /> 7 . 01 All questions about the meaning or intent of the Bidding Documents are to be submitted to <br /> ENGINEER in writing . Interpretations or clarifications considered necessary by ENGINEER in <br /> response to such questions will be issued by Addenda mailed or delivered to all parties through <br /> the Issuing Office as having received the Bidding Documents . Questions received less than ten <br /> days prior to the date for opening of Bids may not be answered . Only questions answered by <br /> Addenda will be binding . Oral and other interpretations or clarifications will be without legal effect. <br /> 00200 - Instructions to Bidders REV 04-07 .doc <br /> 00200 - 4 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0745-Indian River Blvd Sidewalk Imp. Proj 12th_17th St. (LAP)Vadmim\bid documents\00200 - Instructions to Bidders <br /> REV 04-07 .doc Rev. 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.