My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-025
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:40:33 PM
Creation date
10/1/2015 1:39:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/08/2011
Control Number
2011-025
Agenda Item Number
8.D.
Entity Name
Timothy Rose Contracting
Subject
Indian River Boulevard Sidewalk Improvements
Area
12th Street to 17th Street
Project Number
0745
Bid Number
2011023
Archived Roll/Disk#
112-0006-R
Supplemental fields
SmeadsoftID
9258
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEER any duty or authority to supervise or direct E . Unless stated otherwise in the Contract Docu- <br /> the performance of the Work or any duty or ments , words or phrases which have a well-known <br /> authority to undertake responsibility contrary to the technical or construction industry or trade meaning are <br /> provisions of paragraph 9 . 10 or any other provision used in the Contract Documents in accordance ' with <br /> of the Contract Documents . such recognized meaning . <br /> B . Day <br /> ARTICLE 2 - PRELIMINARY MATTERS <br /> 1 . The word "day' shall constitute a <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. 2 . 01 Delivery of Bonds <br /> C . Defective A. When CONTRACTOR delivers the executed <br /> Agreements to OWNER, CONTRACTOR shall also <br /> 1 . The word "defective ," when modifying deliver to OWNER such Bonds as CONTRACTOR <br /> the word "Work," refers to Work that is may be required to furnish . <br /> unsatisfactory, faulty, or deficient in that it does <br /> not conform to the Contract Documents or does 2 . 02 Copies of Documents <br /> not meet the requirements of any inspection , <br /> reference standard , test, or approval referred to A. OWNER shall furnish to CONTRACTOR up <br /> in the Contract Documents , or has been to ten copies of the Contract Documents . Additional <br /> damaged prior to ENGINEER's recom - copies will be furnished upon request at the cost of <br /> mendation of final payment (unless responsi- reproduction . <br /> bility for the protection thereof , has been <br /> assumed by OWNER at Substantial 2 . 03 Commencement of Contract Times; Notice <br /> Completion in accordance with paragraph to Proceed <br /> 14. 04 or 14 . 05) . <br /> A. The Contract Times will commence to run on <br /> D . Furnish, Install, Perform, Provide the thirtieth day after the Effective Date of the Agree- <br /> ment or, if a Notice to Proceed is given , on the day <br /> T ie—weFd 46imish ,'+ when dsed in indicated in the Notice to Proceed . A Notice to Pro- <br /> w <br /> —with SGPiiGes , PR@t£rials , eceed may be given at any time within 30 days after the <br /> e eaz stall mean t^ s6pply and deliver Effective Date of the Agreement. In no event will the <br /> ^ •a So ^ ,i^o^ materials GF egUipFneR+ f„ the. Contract Times commence to run later than the <br /> sixtieth day after the day of Bid opening or the thirtieth <br /> lir <br /> aid iR usable 9F eperable day after the Effective Date of the Agreement , <br /> eaf}ditie whichever date is earlier. <br /> 2 . The , eFd "iRrtall " WheR used—;; 2 . 04 Starting the Work <br /> G3G .nAesteR With seWiG s , materials , er <br /> equipMeRt, sticn mean to ^Y. o Y, se er ^ w��- <br /> t iRtA. CONTRACTOR shall start to perform the <br /> r r <br /> ; A f ^ I P9SitiGR said ^o^ „^o^ moteFialo OF Work on the date when the Contract Times com - <br /> e a .a eat-Gomplete and—ready feF inteRded mence to run . No Work shall be done at the Site prior <br /> use . to the date on which the Contract Times commence to <br /> �j '7-{, ,� run . <br /> d . The—weeds cc <br /> op "^ r � <br /> + <br /> used in rpAnprtinn with 2 . 05 Before Starting Construction <br /> sic;-i •� �r .... shall4- . f. . .. h <br /> afld—install--said 6e1 . . j r . . ater-ials , er A. CONTRACTOR's Review of Contract Docu- <br /> n „ inmo^t ^^mnlete and Fead r fep i ^ te- Aded ments: Before undertaking each part of the Work, <br /> CONTRACTOR shall carefully study and compare the <br /> Contract Documents and check and verify pertinent <br /> 4 . When "furnish ,” "install ," "perform ," or figures therein and all applicable field measurements . <br /> "provide" is not used in connection with services , CONTRACTOR shall promptly report in writing to <br /> materials , or equipment in a context clearly ENGINEER any conflict, error, ambiguity, or <br /> requiring an obligation of CONTRACTOR, discrepancy which CONTRACTOR may discover and <br /> "provide" is implied . shall obtain a written interpretation or clarification from <br /> ENGINEER before proceeding with any Work affected <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 8 <br /> F:\Engineering\Capital Projects\0745 IR BLVD SIDEWALK 12th Street to 17th Street\0745 Contract Docs & Specs\007D0 - General Conditions REV 04-07 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.