thereby; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for :failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a . conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI - <br /> the Effective Date of the Agreement (unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements) , CONTRAC- accordance with paragraph 2 . 05 . 6 . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the. times (numbers of days or dates) CONTRACTOR until acceptable Schedules are <br /> for starting and completing the various stages submitted to ENGINEER. <br /> of the Work, including any Milestones specified <br /> in the Contract Documents ; 1 . The progress schedule will be <br /> acceptable to ENGINEER if it . provides an <br /> 2 . a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within . any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> mitting , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal ; and progress schedule , for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 3 . a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals . <br /> and profit applicable to each item of Work. <br /> 3 . CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> the Site is started , CONTRACTOR and OW NE all and substance if it provides a reasonable <br /> each deliver to the. other, with copi o each allocation of the Contract Price to component <br /> additional insured identified in t upplementa y parts of the Work . <br /> Conditions , certificates of urance (and other ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, <br /> evidence of insurance ich either of them or any AMENDING , REUSE <br /> additional insur may reasonably request) which <br /> CONTRA and OWNER respectively are <br /> 3 . 01 Intent <br /> A. The Contract Documents are comple- <br /> 2 . 06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all . <br /> to run , but before any Work at Reid <br /> Mto <br /> rted , a B . It is the intent of the Contract Documents to <br /> conference attended by CONTRGINEER, describe a functionally complete Project (or part there- <br /> and others as appropriate willtablish a of) to be constructed in accordance with the Contract <br /> weFkiRg to the. Documents . Any labor, documentation , services , <br /> materials , or equipment that may reasonably be <br /> inferred from the Contract Documents or from <br /> prevailing custom or trade usage as being required to <br /> produce the intended result will be provided whether <br /> or not specifically called for at no additional cost to <br /> OWNER. <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 9 <br /> F.Tublic Works\ENGINEERING DIVISION PROJECTS\0745-Indian River Blvd Sidewalk Imp. Proj 12th-17th St. (LAP)\Admim\bid documents\00700 - General Conditions REV <br /> 04-07 .doc <br />