My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . where the Work involved is not cov. f. when both additions and credits are <br /> ered by unit prices contained in the Contract involved in any one change , the adjustment <br /> Documents , by a mutually agreed lump sum in CONTRACTOR ' s fee shall be computed <br /> (which may include an allowance for overhead on the basis of the net change in <br /> and profit not necessarily in accordance with accordance with paragraphs 12 . 01 . C . 2 . a <br /> paragraph 12 . 01 . C . 2 ) ; or through 12 . 01 . C . 2 . e , inclusive . <br /> 3 , where the Work involved is not cov- 12 . 02 Change of Contract Times <br /> ered by unit prices contained in the Contract <br /> Documents and agreement to a lump sum is A. The Contract Times (or Milestones) may only <br /> not reached under paragraph 12 . 01 . 8 . 2 , on the be changed by a Change Order or by a Written <br /> basis of the Cost of the Work (determined as Amendment. Any Claim for an adjustment in the <br /> provided in paragraph 11 . 01 ) plus a Contract Times (or Milestones) shall be based on <br /> CONTRACTOR ' s fee for overhead and profit written notice submitted by the party making the claim <br /> (determined as provided in paragraph to the ENGINEER and the other party to the Contract <br /> 12 . 01 . C ) , in accordance with the provisions of paragraph 10 . 05 . <br /> C . CONTRACTOR 's Fee: The B . Any adjustment of the Contract Times (or <br /> CONTRACTOR ' s fee for overhead and profit shall be Milestones ) covered by a Change Order or of any <br /> determined as follows : Claim for an adjustment in the Contract Times (or <br /> Milestones) will be determined in accordance with the <br /> 1 . a mutually acceptable fixed fee ; or provisions of this Article 12 . <br /> 2 , if a fixed fee is not agreed upon , then 12 . 03 Delays Beyond CONTRACTOR 's Control <br /> a fee based on the following percentages of <br /> the various portions of the Cost of the Work : A. Where CONTRACTOR is prevented from <br /> completing any part of the Work within the Contract <br /> a , for costs incurred under para- Times (or Milestones ) due to delay beyond the control <br /> graphs 11 . 01 . A. 1 and 11 . 01 . A. 2 , the of CONTRACTOR , the Contract Times (or <br /> CONTRACTOR 's fee shall be 15 percent; Milestones ) will be extended in an amount equal to <br /> the time lost due to such delay if a Claim is made <br /> b , for costs incurred under paragraph therefor as provided in paragraph 12 . 02 . A. Delays <br /> 11 . 01 . A . 3 , the CONTRACTOR 's fee shall beyond the control of CONTRACTOR shall include , <br /> be five percent; but not be limited to , acts or neglect by OWNER , acts <br /> or neglect of utility owners or other contractors <br /> C, where one or more tiers of subcon- performing other work as contemplated by Article 7 , <br /> tracts are on the basis of Cost of the Work fires , floods , epidemics , abnormal weather conditions , <br /> plus a fee and no fixed fee is agreed upon , or acts of God , <br /> the intent of paragraph 12 . 01 . C . 2 . a is that <br /> the Subcontractor who actually performs 12 . 04 Delays Within CONTRACTOR 's Control <br /> the Work, at whatever tier, will be paid a fee <br /> of 15 percent of the costs incurred by such A. The Contract Times (or Milestones) will not <br /> Subcontractor under paragraphs 11 . 01 . AA be extended due to delays within the control of <br /> and 11 . 01 . A. 2 and that any higher tier CONTRACTOR . Delays attributable to and within the <br /> Subcontractor and CONTRACTOR will control of a Subcontractor or Supplier shall be <br /> each be paid a fee of five percent of the deemed to be delays within the control of CONTRAC. <br /> amount paid to the next lower tier Subcon- TOR . <br /> tractor; <br /> 12 . 05 Delays Beyond OWNER 's and <br /> d . no fee shall be payable on the CONTRACTOR 's Control <br /> basis of costs itemized under paragraphs <br /> 11 . 01 . A. 4 , 11 . 01 . A. 5 , and 11 . 01 . B ; A. Where CONTRACTOR is prevented from <br /> completing any part of the Work within the Contract <br /> e , the amount of credit to be allowed Times (or Milestones) due to delay beyond the control <br /> by CONTRACTOR to OWNER for any of both OWNER and CONTRACTOR , an extension <br /> change which results in a net decrease in of the Contract Times (or Milestones) in an <br />amount <br /> cost will be the amount of the actual net equal to the time lost due to such <br /> delay shall be <br /> decrease in cost plus a deduction in CONTRACTOR ' s sole and exclusive remedy for such <br /> CONTRACTOR 's fee by an amount equal delay . <br /> to five percent of such net decrease ; and <br /> 00700 - General Conditions REV 04-07. doc <br /> 00700 - 33 <br /> F . \Public Works\ENGINEERING DIVISION PROJECTS\1142-Misc Culvert Replacements\Admim\bid documents\00700 - General Conditions REV 04-07. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.